Finite Element Analysis of Shaft Excavation Stability Using Raise Boring Machine (RBM) Method in Karst Strata with Multiple Cavities
This study investigates the excavation stability of vertical shafts using the Raise Boring Machine (RBM) method in karst strata with multiple cavities, based on the ventilation shaft project of the Zimuyan Tunnel along the Wudao Expressway. A three-dimensional numerical model was established using ABAQUS (version 6.14) to simulate the RBM excavation process and to analyze the effects of cavity positions and depths on the stability of the surrounding rock during excavation. The results show that (1) when the cavities are located at the same position and depth, the radial displacement of the surrounding rock during the reverse reaming stage is reduced by approximately 60% on average compared to that during the forward reaming stage, and the radial stress is also significantly lower during the reverse reaming process; (2) when the cavities are at the same depth, symmetrically distributed cavities cause the surrounding rock displacement to increase by 15–20% compared to vertically aligned cavities, and the stress distribution becomes more complex; and (3) when the cavities are at the same horizontal position but located on different planes, the stability of the surrounding rock improves as the distance between the two cavities increases.
Authors
- Guofeng Wang (ORCID: https://orcid.org/0000-0001-5751-6364)
- Haiyan Xu (ORCID: https://orcid.org/0000-0001-9417-9707)
- Fayi Deng
- Yongqiao Fang
- Kaifu Ren
Institutions
- Sichuan Agricultural University (CN)
Publication Details
- Journal
- Buildings
- Published
- 2025-10-24
- DOI
- https://doi.org/10.3390/buildings15213842
- Primary Topic
- Tunneling and Rock Mechanics
- Type
- article
- Field-Weighted Citation Impact
- 0.00
Funders
- U.S. Department of Transportation