Quantifying the Costs of Field Rework in Construction

Limited knowledge exists about the actual costs of field rework in construction. The reported costs of rework presented in the literature vary significantly because of differing definitions and methods used to quantify them. Exacerbating this problem is the difficulty in obtaining actual field rework data because contractors are typically averse to providing access to their costs due to commercial confidentiality. This paper presents the findings of an exploratory study undertaken by a contractor’s quality managers, who sought to determine the actual costs of field rework in their projects. Actual rework costs, excluding those materializing postcompletion because data were unavailable, were underreported by 300% and were found to be, on average, 0.38% (minimum 0.01% and maximum 3.67%) of a project’s contract value. The quality managers suggested that precompletion and postcompletion rework costs were roughly equal. Thus, with the inclusion of postcompletion corrections, average rework costs increase to an average of 0.76% (minimum 0.02% and maximum 7.34%) of a project’s contract value. Several practical recommendations to help the contractor better track rework costs and their causes have also been identified. The contributions of this paper are twofold: it provides: (1) new insights into the makeup of actual field rework costs, and (2) a series of actions to improve an organization’s ability to document, track, and communicate its rework.

Authors

Institutions

Publication Details

Journal
Journal of Construction Engineering and Management
Published
2025-10-28
DOI
https://doi.org/10.1061/jcemd4.coeng-17026
Primary Topic
Construction Engineering and Safety
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Quantifying the Costs of Field Rework in Construction

Peter E.D. Love
Journal of Construction Engineering and Management
Construction Engineering and Safety
article

Quantifying the Costs of Field Rework in Construction

Peter E.D. Love
article en

Abstract

Limited knowledge exists about the actual costs of field rework in construction. The reported costs of rework presented in the literature vary significantly because of differing definitions and methods used to quantify them. Exacerbating this problem is the difficulty in obtaining actual field rework data because contractors are typically averse to providing access to their costs due to commercial confidentiality. This paper presents the findings of an exploratory study undertaken by a contractor’s quality managers, who sought to determine the actual costs of field rework in their projects. Actual rework costs, excluding those materializing postcompletion because data were unavailable, were underreported by 300% and were found to be, on average, 0.38% (minimum 0.01% and maximum 3.67%) of a project’s contract value. The quality managers suggested that precompletion and postcompletion rework costs were roughly equal. Thus, with the inclusion of postcompletion corrections, average rework costs increase to an average of 0.76% (minimum 0.02% and maximum 7.34%) of a project’s contract value. Several practical recommendations to help the contractor better track rework costs and their causes have also been identified. The contributions of this paper are twofold: it provides: (1) new insights into the makeup of actual field rework costs, and (2) a series of actions to improve an organization’s ability to document, track, and communicate its rework.

Journal of Construction Engineering and ManagementVol. 152(1)
Curtin University (AU)
Openalex Percentile: Top 67%
Construction Engineering and Safety
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.