An Implementation Analysis of AHP-TOPSIS and Music-3D for Optimizing Spare Part Inventory Control (Case Study: PT. Bati)

This study proposes an integrated spare part inventory control decision-making model using AHP-TOPSIS and MUSIC-3D. While previous studies applied these methods independently, this research combines them within a general trading context to address procurement prioritization and inventory segmentation. AHP was used to assign weights to three inventory criteria: annual consumption (ABC), turnover rate (FSN), and unit price (HML). These weights informed the TOPSIS ranking of 50 spare parts, identifying high-priority items such as MRCT 430 and WLOR XR96. MUSIC-3D further classified items into 16 multidimensional categories to support differentiated control strategies. A one-month implementation at PT. BATI demonstrated improvements in stock control and cost efficiency. The model provides a structured, scalable framework for companies facing high inventory complexity. Keywords: Inventory Management, AHP, TOPSIS, MUSIC-3D, Spare parts, Multi-Criteria Decision Making

Authors

Institutions

Publication Details

Journal
Jurnal Teknik Industri Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri
Published
2025-05-15
DOI
https://doi.org/10.24014/jti.v11i1.36786
Primary Topic
Forecasting Techniques and Applications
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An Implementation Analysis of AHP-TOPSIS and Music-3D for Optimizing Spare Part Inventory Control (Case Study: PT. Bati)

Tri Ngudi Wiyatno, Siti Rahayu, Kelvin Leo
Jurnal Teknik Industri Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri
Forecasting Techniques and Applications
article

An Implementation Analysis of AHP-TOPSIS and Music-3D for Optimizing Spare Part Inventory Control (Case Study: PT. Bati)

Tri Ngudi Wiyatno, Siti Rahayu, Kelvin Leo
article en

Abstract

This study proposes an integrated spare part inventory control decision-making model using AHP-TOPSIS and MUSIC-3D. While previous studies applied these methods independently, this research combines them within a general trading context to address procurement prioritization and inventory segmentation. AHP was used to assign weights to three inventory criteria: annual consumption (ABC), turnover rate (FSN), and unit price (HML). These weights informed the TOPSIS ranking of 50 spare parts, identifying high-priority items such as MRCT 430 and WLOR XR96. MUSIC-3D further classified items into 16 multidimensional categories to support differentiated control strategies. A one-month implementation at PT. BATI demonstrated improvements in stock control and cost efficiency. The model provides a structured, scalable framework for companies facing high inventory complexity. Keywords: Inventory Management, AHP, TOPSIS, MUSIC-3D, Spare parts, Multi-Criteria Decision Making

Jurnal Teknik Industri Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik IndustriVol. 11(1)
Universitas Nusa Bangsa (ID), Universitas Pelita Bangsa
Openalex Percentile: Top 64%
Forecasting Techniques and Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.