Efficiency Improvement in Raw Material Inventory Management Using EOQ and POQ (Study Case: PT. Varia Usaha Beton)

This study aims to calculate the need for inventory and ordering of raw materials for concrete production at PT. Varia Usaha Beton optimally so that there is no excess or shortage of inventory to minimize total costs using the EOQ and POQ methods, and comparing the EOQ and POQ methods that will be applied. This study is a descriptive study with a quantitative approach. Data collection is carried out using observation and interview techniques. The results of this study show that by the EOQ method, the quantity of cement raw material orders is 3,109.01 tons with an ordering period of 3 times per year and a total inventory cost of Rp124,110,362.54. Then, in the POQ method, the quantity of cement raw material orders is 708.12 tons with an ordering frequency of 12 times in one year, with an annual inventory cost of Rp368,875,317.77. With the EOQ method, the quantity of raw materials ordered for sand is 9,630.01 tons with an ordering period of 3 times per year and a total inventory cost of Rp 126,473,726.00. Then, in the POQ method, the quantity of raw materials ordered for sand is 2,515.78 tons, with an ordering frequency of 12 times in one year, with an annual inventory cost of Rp 368,875,317.77. With the EOQ method, the quantity of raw materials ordered for stone is 8,383.57 tons with an ordering period of 3 times per year and a total inventory cost of Rp 111,871,065.21. Then, in the POQ method, the quantity of raw materials ordered for stone is 2,429.67 tons, with an ordering frequency of 12 times in one year, with an annual inventory cost of Rp 242,855,765.96. Thus, using the EOQ method produces a lower total cost than the POQ method, by implementing the EOQ method in managing raw material inventory at PT. Varia Usaha Beton in 2023 is projected to save 80.5% of the previous costs on cement raw materials, 80.8% on sand raw materials, and 81% on stone raw materials. Keywords: Inventory Control, Inventory, Economic Order Quantity, Periodic Order Quantity

Authors

Institutions

Publication Details

Journal
Jurnal Teknik Industri Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri
Published
2025-06-20
DOI
https://doi.org/10.24014/jti.v11i1.35903
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Efficiency Improvement in Raw Material Inventory Management Using EOQ and POQ (Study Case: PT. Varia Usaha Beton)

Fourry Handoko, Tsania Lutfia Salsabila Ali Tamam, Sony Haryanto
Jurnal Teknik Industri Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri
Management and Optimization Techniques
article

Efficiency Improvement in Raw Material Inventory Management Using EOQ and POQ (Study Case: PT. Varia Usaha Beton)

Fourry Handoko, Tsania Lutfia Salsabila Ali Tamam, Sony Haryanto
article en

Abstract

This study aims to calculate the need for inventory and ordering of raw materials for concrete production at PT. Varia Usaha Beton optimally so that there is no excess or shortage of inventory to minimize total costs using the EOQ and POQ methods, and comparing the EOQ and POQ methods that will be applied. This study is a descriptive study with a quantitative approach. Data collection is carried out using observation and interview techniques. The results of this study show that by the EOQ method, the quantity of cement raw material orders is 3,109.01 tons with an ordering period of 3 times per year and a total inventory cost of Rp124,110,362.54. Then, in the POQ method, the quantity of cement raw material orders is 708.12 tons with an ordering frequency of 12 times in one year, with an annual inventory cost of Rp368,875,317.77. With the EOQ method, the quantity of raw materials ordered for sand is 9,630.01 tons with an ordering period of 3 times per year and a total inventory cost of Rp 126,473,726.00. Then, in the POQ method, the quantity of raw materials ordered for sand is 2,515.78 tons, with an ordering frequency of 12 times in one year, with an annual inventory cost of Rp 368,875,317.77. With the EOQ method, the quantity of raw materials ordered for stone is 8,383.57 tons with an ordering period of 3 times per year and a total inventory cost of Rp 111,871,065.21. Then, in the POQ method, the quantity of raw materials ordered for stone is 2,429.67 tons, with an ordering frequency of 12 times in one year, with an annual inventory cost of Rp 242,855,765.96. Thus, using the EOQ method produces a lower total cost than the POQ method, by implementing the EOQ method in managing raw material inventory at PT. Varia Usaha Beton in 2023 is projected to save 80.5% of the previous costs on cement raw materials, 80.8% on sand raw materials, and 81% on stone raw materials. Keywords: Inventory Control, Inventory, Economic Order Quantity, Periodic Order Quantity

Jurnal Teknik Industri Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik IndustriVol. 11(1)
Institut Teknologi Nasional Malang (ID)
Openalex Percentile: Top 55%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.