Correction: Attenuation of Rayleigh waves by a combined periodic open trench-wave impeding block vibration isolating barrier considering tunnel influence
A correction refers to a change to their article that the author wishes to publish after publication. The publication of this article is subject to Frontiers' editorial approval.• Please read through all the templates before choosing • Pick the most relevant text template(s) from the following page and delete all others.• Edit the text as necessary, ensuring that the original incorrect text is included for the record, please see the below. • Please do not use any extra formatting when editing the templates, and only modify the red text unless absolutely necessary • Submit to Frontiers following the instructions on this page.When the original text contained incorrect information, to preserve the scientific record, please include that text when editing the below templates. For example:There was a mistake in the Funding statement, an incorrect number was used.The correct number is "2015C03Bd051.". The publisher apologizes for this mistake.The original version of this article has been updated.
Authors
- Bin Hou (ORCID: https://orcid.org/0000-0002-5368-3699)
- Wenwen Li (ORCID: https://orcid.org/0000-0003-1868-1302)
- J. Pei
Institutions
- Gansu Great Wall Electrical and Electronics Engineering Research Institute (CN)
Publication Details
- Journal
- Frontiers in Physics
- Published
- 2025-10-27
- DOI
- https://doi.org/10.3389/fphy.2025.1722211
- Primary Topic
- Geotechnical Engineering and Underground Structures
- Type
- article
- Field-Weighted Citation Impact
- 0.00