Thames Tideway Tunnel: Hammersmith Pumping Station – highly constrained working

The Thames Tideway Tunnel project is a deep tunnel system for combined sewer overflow (CSO) control in London, UK. The project controls flows from 34 CSOs by transferring flows to Beckton Sewage Treatment Works for treatment. This paper focusses on the CSO interception works undertaken at Hammersmith Pumping Station, from outline design development through to the detailed design, construction and commissioning. The development of the hydraulic and structural design for the interception of the combined sewage flows at the existing Thames Water pumping station is described. The methods of construction and logistics for these works and for the drop shaft, connection tunnel to the main tunnel and other civil engineering works are also described. There is a focus on the temporary works undertaken to enable works in the pumping station’s inlet channel and for the adjacent interception chamber, the instrumentation undertaken in the upstream catchment sewers and the close working relationship with Thames Water. Design and construction methods and working arrangements accommodated significant constraints, including limited available land for the construction site, working adjacent to a new property development, maintaining a good relationship with the local community and ensuring the pumping station remained operational at all times.

Authors

Institutions

Publication Details

Journal
Proceedings of the Institution of Civil Engineers - Civil Engineering
Published
2025-10-23
DOI
https://doi.org/10.1680/jcien.25.00037
Citations
3
Primary Topic
Geotechnical Engineering and Analysis
Type
article
Field-Weighted Citation Impact
3.91
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Thames Tideway Tunnel: Hammersmith Pumping Station – highly constrained working

John Corcoran, Andrew Eccles, Patricia P. Sanchez, Brian Jackson
3 citations
Proceedings of the Institution of Civil Engineers - Civil Engineering
Geotechnical Engineering and Analysis
3.91
article

Thames Tideway Tunnel: Hammersmith Pumping Station – highly constrained working

John Corcoran, Andrew Eccles, Patricia P. Sanchez, Brian Jackson
article en
3 citations

Abstract

The Thames Tideway Tunnel project is a deep tunnel system for combined sewer overflow (CSO) control in London, UK. The project controls flows from 34 CSOs by transferring flows to Beckton Sewage Treatment Works for treatment. This paper focusses on the CSO interception works undertaken at Hammersmith Pumping Station, from outline design development through to the detailed design, construction and commissioning. The development of the hydraulic and structural design for the interception of the combined sewage flows at the existing Thames Water pumping station is described. The methods of construction and logistics for these works and for the drop shaft, connection tunnel to the main tunnel and other civil engineering works are also described. There is a focus on the temporary works undertaken to enable works in the pumping station’s inlet channel and for the adjacent interception chamber, the instrumentation undertaken in the upstream catchment sewers and the close working relationship with Thames Water. Design and construction methods and working arrangements accommodated significant constraints, including limited available land for the construction site, working adjacent to a new property development, maintaining a good relationship with the local community and ensuring the pumping station remained operational at all times.

Proceedings of the Institution of Civil Engineers - Civil EngineeringVol. 178(6)
Thames Water (United Kingdom) (GB), Morgan Stanley (United Kingdom) (GB), Jacobs (United Kingdom) (GB)
Openalex Percentile: Top 6%
Geotechnical Engineering and Analysis
3.91
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Thames Tideway Tunnel: Hammersmith Pumping Station – highly constrained working — John Corcoran, Andrew Eccles, et al. · Proceedings of the Institution of Civil Engineers - Civil Engineering (2025) | TGRS Research Map | TGRS