Experimental study on blasting with a short straight hole + wedge compound cut scheme in hard rock tunnels

Introduction In drill-and-blast excavation for small- and medium-sized tunnels, the conventional wedge-cut blasting method is often constrained by the limited maneuvering space of construction equipment. This restriction can result in excessive inclination of wedge-cut holes relative to the tunnel face. Consequently, the rock in the cut zone is subjected to strong confinement, leading to reduced advance per round, low blasthole utilization efficiency, and an increased specific charge. Methods In this study, theoretical analysis and formula derivation were conducted to evaluate the respective advantages and limitations of wedge cutting and straight-hole cutting. Based on these analyses, optimal layout parameters for straight holes were determined. A combined short straight-hole + wedge compound cut blasting scheme was subsequently proposed and tested in a hard rock tunnel. Results When calculating the spacing between charge holes and relief holes, the influence of high strain rates on the rock’s tensile strength should be incorporated to ensure that theoretical parameters are both accurate and applicable. Compared with the original blasting scheme, the designed compound cut method increased the advance per round from 1.7–1.8 m to 2.0–2.1 m and improved blasthole utilization from 73.91%–78.26% to 86.96%–91.30%. The specific charge remained nearly unchanged, while detonator consumption decreased by approximately 0.4 detonators/m 3 , demonstrating clear economic benefits. The application of the short straight-hole + wedge compound cut technique also resulted in fewer remaining holes and finer rock fragmentation at the tunnel face, thereby enhancing the efficiency of muck removal and drilling operations in subsequent cycles. Discussion The short straight-hole + wedge compound cut technique has been successfully applied in small and medium-sized section hard rock tunnels,These results offer valuable guidance for optimizing drill-and-blast design parameters and construction practices in small- and medium-scale hard rock tunneling projects.

Authors

Institutions

Publication Details

Journal
Frontiers in Earth Science
Published
2025-10-22
DOI
https://doi.org/10.3389/feart.2025.1684101
Citations
1
Primary Topic
Fluid Dynamics Simulations and Interactions
Type
article
Field-Weighted Citation Impact
1.33
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Experimental study on blasting with a short straight hole + wedge compound cut scheme in hard rock tunnels

Guo‐Wei He, Sen Peng, Xiaoming Tang, Lin Yang et al.
1 citations
Frontiers in Earth Science
Fluid Dynamics Simulations and Interactions
1.33
article

Experimental study on blasting with a short straight hole + wedge compound cut scheme in hard rock tunnels

Guo‐Wei He, Sen Peng, Xiaoming Tang, Lin Yang, Xu Jinxing, M.J. Tu
article en
1 citations

Abstract

Introduction In drill-and-blast excavation for small- and medium-sized tunnels, the conventional wedge-cut blasting method is often constrained by the limited maneuvering space of construction equipment. This restriction can result in excessive inclination of wedge-cut holes relative to the tunnel face. Consequently, the rock in the cut zone is subjected to strong confinement, leading to reduced advance per round, low blasthole utilization efficiency, and an increased specific charge. Methods In this study, theoretical analysis and formula derivation were conducted to evaluate the respective advantages and limitations of wedge cutting and straight-hole cutting. Based on these analyses, optimal layout parameters for straight holes were determined. A combined short straight-hole + wedge compound cut blasting scheme was subsequently proposed and tested in a hard rock tunnel. Results When calculating the spacing between charge holes and relief holes, the influence of high strain rates on the rock’s tensile strength should be incorporated to ensure that theoretical parameters are both accurate and applicable. Compared with the original blasting scheme, the designed compound cut method increased the advance per round from 1.7–1.8 m to 2.0–2.1 m and improved blasthole utilization from 73.91%–78.26% to 86.96%–91.30%. The specific charge remained nearly unchanged, while detonator consumption decreased by approximately 0.4 detonators/m 3 , demonstrating clear economic benefits. The application of the short straight-hole + wedge compound cut technique also resulted in fewer remaining holes and finer rock fragmentation at the tunnel face, thereby enhancing the efficiency of muck removal and drilling operations in subsequent cycles. Discussion The short straight-hole + wedge compound cut technique has been successfully applied in small and medium-sized section hard rock tunnels,These results offer valuable guidance for optimizing drill-and-blast design parameters and construction practices in small- and medium-scale hard rock tunneling projects.

Frontiers in Earth ScienceVol. 13
People’s Hospital of Wenshan Prefecture (CN), Shanghai Tunnel Engineering Rail Transit Design & Research Institute (CN), CCCC Wuhan Harbour Engineering Design and Research (China) (CN), Wenshan University (CN)
Openalex Percentile: Top 17%
Fluid Dynamics Simulations and Interactions
1.33
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.