Integrating PC Splitting Design and Construction Organization Through Multi-Agent Simulation for Prefabricated Buildings

Prefabricated building projects represent industrialized and intelligent construction through factory production, standardized design, and mechanized assembly. This study presents a multi-agent simulation approach to model the prefabricated construction process, allowing for the concurrent optimization of the prefabricated component (PC) splitting design and the construction organization plan through iterative simulation. (1) Employing a questionnaire survey, it identifies critical factors affecting schedule and cost from a design–construction coordination perspective. (2) Based on these findings, an agent-based model was developed incorporating PC installation, crane operations, and storage yard spatial constraints, along with interaction rules governing these agents. (3) Data interoperability was achieved among Revit, NetLogo3D and Navisworks. This integrated environment offers project managers digital management of design and construction plans, simulation support, and visualization tools. Simulation results confirm that a hybrid resource allocation strategy utilizing both tower cranes and mobile cranes enhances resource leveling, accelerates schedule performance, and improves cost efficiency.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2025-10-19
DOI
https://doi.org/10.3390/buildings15203773
Citations
1
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
1.01
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Integrating PC Splitting Design and Construction Organization Through Multi-Agent Simulation for Prefabricated Buildings

Yi Shen, Guangyong Jin, Jing Wang
1 citations
Buildings
BIM and Construction Integration
1.01
article

Integrating PC Splitting Design and Construction Organization Through Multi-Agent Simulation for Prefabricated Buildings

Yi Shen, Guangyong Jin, Jing Wang
article en
1 citations

Abstract

Prefabricated building projects represent industrialized and intelligent construction through factory production, standardized design, and mechanized assembly. This study presents a multi-agent simulation approach to model the prefabricated construction process, allowing for the concurrent optimization of the prefabricated component (PC) splitting design and the construction organization plan through iterative simulation. (1) Employing a questionnaire survey, it identifies critical factors affecting schedule and cost from a design–construction coordination perspective. (2) Based on these findings, an agent-based model was developed incorporating PC installation, crane operations, and storage yard spatial constraints, along with interaction rules governing these agents. (3) Data interoperability was achieved among Revit, NetLogo3D and Navisworks. This integrated environment offers project managers digital management of design and construction plans, simulation support, and visualization tools. Simulation results confirm that a hybrid resource allocation strategy utilizing both tower cranes and mobile cranes enhances resource leveling, accelerates schedule performance, and improves cost efficiency.

BuildingsVol. 15(20)
Shanghai University of Engineering Science (CN)
Openalex Percentile: Top 19%
BIM and Construction Integration
1.01
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.