Assessing the impact of communication skills on facility management project success in Ghana

Purpose Facility management (FM) often oversees diverse infrastructure and maintenance initiatives that require structured project management (PM) approaches to ensure successful delivery in Africa. However, the overlap between FM and PM roles is frequently misunderstood in Ghana, where FM departments lead critical capital projects. This study addresses the blurred boundary between FM and PM by explicitly focusing on projects implemented under FM functions, with emphasis on how communication skills influence project success. It aims to assess the effectiveness of communication in enhancing FM project outcomes within the Greater Accra Region. Design/methodology/approach A quantitative, descriptive cross-sectional survey was conducted among 150 facility and project management professionals. Structured questionnaires were administered, and data were analysed using SPSS v26. Analytical techniques included descriptive statistics, Pearson correlation and multiple regression analysis. Findings Findings show that effective communication enhances project decision-making (M = 4.40), documentation (M = 4.35) and team collaboration (M = 4.30). Communication practices explained 61.1% of the variance in project performance, while communication strategies accounted for 64.2%. Key predictors included clear communication structures (B = 0.245), open communication (B = 0.203) and regular meetings (B = 0.192). Barriers such as lack of transparency (r = −0.394) and unclear communication channels (r = −0.387) negatively impacted project outcomes. Originality/value This pioneering study contributes insights from Ghana, clarifies the FM–PM relationship and underscores the global trends on communication as a factor in the delivery of FM-led projects across Africa.

Authors

Institutions

Publication Details

Journal
International Journal of Building Pathology and Adaptation
Published
2025-10-20
DOI
https://doi.org/10.1108/ijbpa-07-2025-0188
Citations
2
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
4.21
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Assessing the impact of communication skills on facility management project success in Ghana

Christopher Amoah, Abubakar Sadiq Mohammed, Patrick Atepreh, Julius Atsu et al.
2 citations
International Journal of Building Pathology and Adaptation
Construction Project Management and Performance
4.21
article

Assessing the impact of communication skills on facility management project success in Ghana

Christopher Amoah, Abubakar Sadiq Mohammed, Patrick Atepreh, Julius Atsu, Prosper Attah
article en
2 citations

Abstract

Purpose Facility management (FM) often oversees diverse infrastructure and maintenance initiatives that require structured project management (PM) approaches to ensure successful delivery in Africa. However, the overlap between FM and PM roles is frequently misunderstood in Ghana, where FM departments lead critical capital projects. This study addresses the blurred boundary between FM and PM by explicitly focusing on projects implemented under FM functions, with emphasis on how communication skills influence project success. It aims to assess the effectiveness of communication in enhancing FM project outcomes within the Greater Accra Region. Design/methodology/approach A quantitative, descriptive cross-sectional survey was conducted among 150 facility and project management professionals. Structured questionnaires were administered, and data were analysed using SPSS v26. Analytical techniques included descriptive statistics, Pearson correlation and multiple regression analysis. Findings Findings show that effective communication enhances project decision-making (M = 4.40), documentation (M = 4.35) and team collaboration (M = 4.30). Communication practices explained 61.1% of the variance in project performance, while communication strategies accounted for 64.2%. Key predictors included clear communication structures (B = 0.245), open communication (B = 0.203) and regular meetings (B = 0.192). Barriers such as lack of transparency (r = −0.394) and unclear communication channels (r = −0.387) negatively impacted project outcomes. Originality/value This pioneering study contributes insights from Ghana, clarifies the FM–PM relationship and underscores the global trends on communication as a factor in the delivery of FM-led projects across Africa.

International Journal of Building Pathology and Adaptation
Accra Technical University (GH), University of the Free State (ZA)
Openalex Percentile: Top 5%
Construction Project Management and Performance
4.21
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.