Prediction of the project schedule performance outcome with last planner system and social network analysis indicators

Purpose Building earlier last planner system (LPS) only schedule predictors, this study integrates social network analysis (SNA) collaboration metrics and earned value method (EVM) indicators with LPS data to forecast the final schedule performance index (SPI) at planned completion. The approach offers earlier, more actionable diagnostics by having dependence on lagging EVM measures and highlighting team-interaction drivers of schedule risk. Design/methodology/approach The model was developed using machine learning (ML) regression trained on data from 160 projects across ten progress intervals. It incorporated five scope metrics, nine EVM metrics, eight LPS performance metrics and eight LPS collaboration metrics to predict the schedule performance index (SPI) at the end of the initial plan. Data Science and SNA techniques were applied to extract these metrics from LPS software. Findings The LPS-based model using support vector regression achieved an R2 = 0.861 and a mean absolute error of 0.067. The model exhibited greater robustness across 90% of the sample and significantly reduced reliance on result-oriented metrics from 88% to 49%. Research limitations/implications Future research should explore the applicability of the model in different project contexts and further refine the integration of LPS metrics with predictive analytics. Limitations include the reliance on historical data and potential variations in LPS implementation across projects. Practical implications The proposed model provides a proactive approach to schedule compliance prediction, reducing dependence on traditional result-oriented metrics. This enables project managers to anticipate schedule risks earlier and take corrective actions based on LPS performance and collaboration indicators. Originality/value This study presents a novel approach to outcome prediction by leveraging LPS and SNA data for ML regression, demonstrating its potential to enhance schedule performance assessments while shifting the focus from reactive to proactive planning.

Authors

Institutions

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2025-10-17
DOI
https://doi.org/10.1108/ecam-03-2025-0424
Citations
1
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
2.11
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Prediction of the project schedule performance outcome with last planner system and social network analysis indicators

Luís F. Alarcón, Camilo I. Lagos, Alejandro Vergara, Rodrigo F. Herrera
1 citations
Engineering Construction & Architectural Management
Construction Project Management and Performance
2.11
article

Prediction of the project schedule performance outcome with last planner system and social network analysis indicators

Luís F. Alarcón, Camilo I. Lagos, Alejandro Vergara, Rodrigo F. Herrera
article en
1 citations

Abstract

Purpose Building earlier last planner system (LPS) only schedule predictors, this study integrates social network analysis (SNA) collaboration metrics and earned value method (EVM) indicators with LPS data to forecast the final schedule performance index (SPI) at planned completion. The approach offers earlier, more actionable diagnostics by having dependence on lagging EVM measures and highlighting team-interaction drivers of schedule risk. Design/methodology/approach The model was developed using machine learning (ML) regression trained on data from 160 projects across ten progress intervals. It incorporated five scope metrics, nine EVM metrics, eight LPS performance metrics and eight LPS collaboration metrics to predict the schedule performance index (SPI) at the end of the initial plan. Data Science and SNA techniques were applied to extract these metrics from LPS software. Findings The LPS-based model using support vector regression achieved an R2 = 0.861 and a mean absolute error of 0.067. The model exhibited greater robustness across 90% of the sample and significantly reduced reliance on result-oriented metrics from 88% to 49%. Research limitations/implications Future research should explore the applicability of the model in different project contexts and further refine the integration of LPS metrics with predictive analytics. Limitations include the reliance on historical data and potential variations in LPS implementation across projects. Practical implications The proposed model provides a proactive approach to schedule compliance prediction, reducing dependence on traditional result-oriented metrics. This enables project managers to anticipate schedule risks earlier and take corrective actions based on LPS performance and collaboration indicators. Originality/value This study presents a novel approach to outcome prediction by leveraging LPS and SNA data for ML regression, demonstrating its potential to enhance schedule performance assessments while shifting the focus from reactive to proactive planning.

Engineering Construction & Architectural ManagementVol. 33(2)
Pontificia Universidad Católica de Chile (CL), Pontificial Catholic University of Valparaiso (CL)
Openalex Percentile: Top 10%
Construction Project Management and Performance
2.11
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.