Exploring Causes of Waste Relating to the Role of Project Managers in Highway Projects in Pakistan

The construction industry is struggling to resolve the issue of the enormous quantity of waste produced during construction processes, which impacts the performance and sustainability of projects. Causes of waste generation have been studied by researchers to formulate waste minimization strategies for these projects. The research on waste in highway infrastructure projects and waste causes specific to the roles and competencies of project team members is inadequate. This quantitative study addresses this gap by evaluating the influence of project managers (PMs) in minimizing CW through a structured questionnaire survey administered to 300 professionals, yielding 129 valid responses (43% response rate). The results indicate that 8.5% of construction materials are wasted in highway projects. Among four key project stakeholders (PM, quantity surveyor, designer, and client), PMs were rated as having the most significant impact on waste minimization (mean Likert score: 4.5/5). Using the Relative Importance Index (RII), the study identified the top five waste causes linked to PM competencies: faulty work requiring the work to be carried out again (RII = 0.742), wrong construction methods (0.734), lack of awareness (0.731), poor supervision (0.721), and poor material planning (0.706). A waste minimization framework is proposed, linking each of these causes to specific PM competencies and actionable strategies. These findings provide empirical support for targeting PM training and resource planning to reduce material waste in highway construction projects.

Authors

Institutions

Publication Details

Published
2025-10-14
DOI
https://doi.org/10.3390/engproc2025111002
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Exploring Causes of Waste Relating to the Role of Project Managers in Highway Projects in Pakistan

Rafiq Mansoor, Mughees Aslam, Muhammad Haroon, Javed Ahmed Khan Tipu et al.
Construction Project Management and Performance
article

Exploring Causes of Waste Relating to the Role of Project Managers in Highway Projects in Pakistan

Rafiq Mansoor, Mughees Aslam, Muhammad Haroon, Javed Ahmed Khan Tipu, Farrokh Jaleel, Usman Aftab
article en

Abstract

The construction industry is struggling to resolve the issue of the enormous quantity of waste produced during construction processes, which impacts the performance and sustainability of projects. Causes of waste generation have been studied by researchers to formulate waste minimization strategies for these projects. The research on waste in highway infrastructure projects and waste causes specific to the roles and competencies of project team members is inadequate. This quantitative study addresses this gap by evaluating the influence of project managers (PMs) in minimizing CW through a structured questionnaire survey administered to 300 professionals, yielding 129 valid responses (43% response rate). The results indicate that 8.5% of construction materials are wasted in highway projects. Among four key project stakeholders (PM, quantity surveyor, designer, and client), PMs were rated as having the most significant impact on waste minimization (mean Likert score: 4.5/5). Using the Relative Importance Index (RII), the study identified the top five waste causes linked to PM competencies: faulty work requiring the work to be carried out again (RII = 0.742), wrong construction methods (0.734), lack of awareness (0.731), poor supervision (0.721), and poor material planning (0.706). A waste minimization framework is proposed, linking each of these causes to specific PM competencies and actionable strategies. These findings provide empirical support for targeting PM training and resource planning to reduce material waste in highway construction projects.

International Islamic University, Islamabad (PK), Capital University of Science and Technology (PK), National University of Sciences and Technology (PK)
Openalex Percentile: Top 66%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.