Island operation strategy under extreme disaster weather
To improve the power supply guarantee capability under extreme weather conditions, this paper presents island operation model under extreme disaster weather. Batts model for typhoon wind speed and the failure rate model were established, and the Monte Carlo method was used to simulate the fault scenario and obtain the fault line; The optimization in pre-disaster stage aims to minimize economic costs and network losses. The adaptive discrete particle swarm optimization algorithm is used to solve the optimization model for distributed site selection and capacity determination of wind-solar-storage enengy.By comparing and analyzing the load recovery results and economics of different strategies through numerical examples, the feasibility and superiority of the model proposed in this paper were verified.
Authors
- Dexiang Li
- Wu Jiekang (ORCID: https://orcid.org/0000-0002-8512-2079)
- Milu Zhou
- Ling Li (ORCID: https://orcid.org/0000-0002-7622-8752)
- Huijie Sun
- Yicong Mo
Institutions
- Guangdong University of Technology (CN)
- China Southern Power Grid (China) (CN)
Publication Details
- Published
- 2025-08-22
- DOI
- https://doi.org/10.1109/ccris65764.2025.11192986
- Primary Topic
- Island Studies and Pacific Affairs
- Type
- article
- Field-Weighted Citation Impact
- 0.00