Research on the Optimization of the Volume Fracturing Shut-in and Drainage System of Unconventional Reservoirs in the Erlian Block
Aiming at unclear imbibition replacement mechanisms and flowback/production strategies in unconventional reservoirs of the Erlian Block, this study proposes a systematic approach integrating “imbibition-flowback-productivity synergy” to optimize post-fracturing shut-in and production regimes. By developing numerical models incorporating geological and engineering factors, we analyzed fluid dynamics during both the shut-in and production phases. Concurrently, crude oil displacement-fracturing fluid imbibition replacement experiments were conducted to guide parameter optimization. The results indicate that optimized shut-in time and production rates substantially increase recovery efficiency while mitigating reservoir damage and proppant flowback. The well shut-in time of the Erlian Block can achieve the optimal shut-in replacement effect in about 20–25 days. The optimized flowback rate of the unconventional reservoir in the Erlian Block is 25–30 m3/d. The findings offer theoretical insights and practical recommendations for the efficient development of unconventional resources.
Authors
- Guohua Liu (ORCID: https://orcid.org/0000-0001-8491-1562)
- Xinfang Ma
- Changjun Long
- Shuzhi Xiu
- Ning Li (ORCID: https://orcid.org/0000-0002-8567-4025)
- Xu Liu (ORCID: https://orcid.org/0000-0002-7369-6200)
- He Ma (ORCID: https://orcid.org/0000-0002-4670-4404)
Institutions
- China University of Petroleum, Beijing (CN)
- State Key Laboratory of Oil and Gas Reservoir Geology and Exploitation (CN)
- Research Institute of Petroleum Exploration and Development (CN)
- China National Petroleum Corporation (China) (CN)
Publication Details
- Journal
- Processes
- Published
- 2025-10-13
- DOI
- https://doi.org/10.3390/pr13103258
- Primary Topic
- Hydraulic Fracturing and Reservoir Analysis
- Type
- article
- Field-Weighted Citation Impact
- 0.00