Improving industrial planning of overhead line renovations using a criticality indicator method based on a risk and impact estimation of future failures

In France, 40% of Enedis customers are served by overhead lines, 77% of which are over 25 years old. Originally designed for a 40-year lifespan, these lines face an increased risk of failure after 30 years. To address this, Enedis has launched a €2 billion renovation campaign aimed at upgrading 230,000 km of aging infrastructure by 2035. Traditionally, failure data has been used to prioritize lines at risk, but many aging lines have not failed yet, requiring costly inspections for prioritization. To optimize targeting, Enedis developed a criticality-based method integrated into PowerFactory/Erable software. This method calculates a criticality indicator for each line using a Weibull model for failure rates and an algorithm to simulate the recovery scheme's impact. This approach enables more efficient identification of lines in need of renovation, improving cost-efficiency and ensuring continuous electricity supply while minimizing inspection costs.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-10-14
DOI
https://doi.org/10.1049/icp.2025.1432
Primary Topic
Reliability and Maintenance Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Improving industrial planning of overhead line renovations using a criticality indicator method based on a risk and impact estimation of future failures

Cécile Donde, Olivier Delmas, Hugo Dufay
IET conference proceedings.
Reliability and Maintenance Optimization
article

Improving industrial planning of overhead line renovations using a criticality indicator method based on a risk and impact estimation of future failures

Cécile Donde, Olivier Delmas, Hugo Dufay
article en

Abstract

In France, 40% of Enedis customers are served by overhead lines, 77% of which are over 25 years old. Originally designed for a 40-year lifespan, these lines face an increased risk of failure after 30 years. To address this, Enedis has launched a €2 billion renovation campaign aimed at upgrading 230,000 km of aging infrastructure by 2035. Traditionally, failure data has been used to prioritize lines at risk, but many aging lines have not failed yet, requiring costly inspections for prioritization. To optimize targeting, Enedis developed a criticality-based method integrated into PowerFactory/Erable software. This method calculates a criticality indicator for each line using a Weibull model for failure rates and an algorithm to simulate the recovery scheme's impact. This approach enables more efficient identification of lines in need of renovation, improving cost-efficiency and ensuring continuous electricity supply while minimizing inspection costs.

IET conference proceedings.Vol. 2025(14)
Centre Hospitalier Métropole Savoie (FR), Pusan National University (KR)
Openalex Percentile: Top 64%
Reliability and Maintenance Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Improving industrial planning of overhead line renovations using a criticality indicator method based on a risk and impact estimation of future failures — Cécile Donde, Olivier Delmas, et al. · IET conference proceedings. (2025) | TGRS Research Map | TGRS