E-REDES requirements for simulation in meeting RFG compliance on Portuguese distribution grid connections

Integrating renewable energy into power grids requires rigorous validation to ensure compliance with European Network Codes for generator connection (RfG), which transfers to the grid operators the responsibility of verifying its assessment of their area of operation. This conformity can be achieved by several means, such as certificate analysis, numerical simulation or on-field testing. The RfG conformity criteria is left to the grid operator. Since the grid code entered into force, E-REDES Portugal, the Portuguese Distribution System Operator (DSO), established a connection process compliant with the RfG and put a focus on evidence gathering. E-REDES conformity assessment is based on numerical simulation and set requirements for the generator owner's simulations. To ensure adequate testing parameterization and alignment with other DSO requirements, E-REDES and EDP LABELEC teamed up to review requirements. The approach involved a comprehensive benchmarking study of the simulation methods used by various DSOs. This comparison aims to identify the methods, software, and simulations needed to guide generator facility owners in ensuring grid code compliance, starting with evaluating generator behaviour during grid faults. The authors ran several simulations and analysed the results in accordance with grid code requir ements and E-REDES requirements to conclude the merit of requiring such simulations.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-10-14
DOI
https://doi.org/10.1049/icp.2025.1756
Primary Topic
Power Line Communications and Noise
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

E-REDES requirements for simulation in meeting RFG compliance on Portuguese distribution grid connections

Tiago Rosa, Miguel Louro, Narciso Pereira, A.P. Neves et al.
IET conference proceedings.
Power Line Communications and Noise
article

E-REDES requirements for simulation in meeting RFG compliance on Portuguese distribution grid connections

Tiago Rosa, Miguel Louro, Narciso Pereira, A.P. Neves, Andreia Leiria, António Esteves
article en

Abstract

Integrating renewable energy into power grids requires rigorous validation to ensure compliance with European Network Codes for generator connection (RfG), which transfers to the grid operators the responsibility of verifying its assessment of their area of operation. This conformity can be achieved by several means, such as certificate analysis, numerical simulation or on-field testing. The RfG conformity criteria is left to the grid operator. Since the grid code entered into force, E-REDES Portugal, the Portuguese Distribution System Operator (DSO), established a connection process compliant with the RfG and put a focus on evidence gathering. E-REDES conformity assessment is based on numerical simulation and set requirements for the generator owner's simulations. To ensure adequate testing parameterization and alignment with other DSO requirements, E-REDES and EDP LABELEC teamed up to review requirements. The approach involved a comprehensive benchmarking study of the simulation methods used by various DSOs. This comparison aims to identify the methods, software, and simulations needed to guide generator facility owners in ensuring grid code compliance, starting with evaluating generator behaviour during grid faults. The authors ran several simulations and analysed the results in accordance with grid code requir ements and E-REDES requirements to conclude the merit of requiring such simulations.

IET conference proceedings.Vol. 2025(14)
Energias de Portugal (Portugal) (PT), Redes Energéticas Nacionais (Portugal) (PT)
Openalex Percentile: Top 71%
Power Line Communications and Noise
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

E-REDES requirements for simulation in meeting RFG compliance on Portuguese distribution grid connections — Tiago Rosa, Miguel Louro, et al. · IET conference proceedings. (2025) | TGRS Research Map | TGRS