General outline about the smart meter system in Japan: its history, specification, performance and future prospect

In Japan, smart meter deployment had begun around the early 2010’s, and the penetration rate will reach 100% as of the end of March 2025. It is a quite unique approach that the ministry has been leading and pushing the related discussion and the implementation. One utility company had launched the R&D activities about smart meter system focusing on the labor safety and the work efficiency at the early 2000’s. After the big earthquake in 2011, reflecting upon the rolling outage in Tokyo, the capital city of Japan, the discussion about the deployment of smart meter was launched by the ministry, pushing 10 electric power utilities to launch the implementation of smart meter system and complete it within around 10 years. This article shows the history, characteristics and specifications of the smart meter system in Japan, and the current status and future prospects of the second-generation smart meter system, hereinafter “#2 System”.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-10-14
DOI
https://doi.org/10.1049/icp.2025.1922
Primary Topic
Smart Grid Energy Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

General outline about the smart meter system in Japan: its history, specification, performance and future prospect

Yasuo Matsuura, Daisuke Yamaguchi, Hitoshi Motojima, Hiroki Watanabe et al.
IET conference proceedings.
Smart Grid Energy Management
article

General outline about the smart meter system in Japan: its history, specification, performance and future prospect

Yasuo Matsuura, Daisuke Yamaguchi, Hitoshi Motojima, Hiroki Watanabe, Takahito Tomihari, Hideharu Oniki
article en

Abstract

In Japan, smart meter deployment had begun around the early 2010’s, and the penetration rate will reach 100% as of the end of March 2025. It is a quite unique approach that the ministry has been leading and pushing the related discussion and the implementation. One utility company had launched the R&D activities about smart meter system focusing on the labor safety and the work efficiency at the early 2000’s. After the big earthquake in 2011, reflecting upon the rolling outage in Tokyo, the capital city of Japan, the discussion about the deployment of smart meter was launched by the ministry, pushing 10 electric power utilities to launch the implementation of smart meter system and complete it within around 10 years. This article shows the history, characteristics and specifications of the smart meter system in Japan, and the current status and future prospects of the second-generation smart meter system, hereinafter “#2 System”.

IET conference proceedings.Vol. 2025(14)
TEPCO (Japan) (JP), J-Power (Japan) (JP), National Grid (United States) (US), Kansai University (JP), Chubu Electric Power (Japan) (JP)
Openalex Percentile: Top 71%
Smart Grid Energy Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

General outline about the smart meter system in Japan: its history, specification, performance and future prospect — Yasuo Matsuura, Daisuke Yamaguchi, et al. · IET conference proceedings. (2025) | TGRS Research Map | TGRS