Distribution network development amid policy actions: regulatory plans as a steering strategy
Building a single high-voltage line in the distribution network can take 5 to 10 years from initial planning and construction permitting to full operation. The time required for increasing the capacity of high-voltage electricity distribution therefore poses a risk that the necessary level of network renewal for a reliable, decarbonized energy system may not be completed in time. Hence, a well-prioritized strategy for network renewal, based on a clear numerical understanding of changes in the operational environment, is needed. This study outlines the Finnish long-term distribution network planning framework to meet this need, supported by other regulatory steering elements, such as direct service level obligations and economic incentives to improve the network.
Authors
- Joel Seppälä (ORCID: https://orcid.org/0000-0002-6074-340X)
- Pertti Järventausta (ORCID: https://orcid.org/0000-0002-7191-4825)
Institutions
- Tampere University of Applied Sciences (FI)
- Tampere University (FI)
Publication Details
- Journal
- IET conference proceedings.
- Published
- 2025-10-14
- DOI
- https://doi.org/10.1049/icp.2025.1442
- Primary Topic
- Transport and Economic Policies
- Type
- article
- Field-Weighted Citation Impact
- 0.00