Revisiting IT Project Uncertainty: Operationalizing the Sambamurthy–Zmud Model for De-Risking Digital Transformation Projects

Uncertainty in project deliverables remains a pervasive source of IT project failure, yet its structural origins are rarely operationalized. Sambamurthy and Zmud (2017) proposed a conceptual model linking IT project uncertainty to two fundamental dimensions: (1) the clarity or ambiguity of project deliverable specifications and (2) the number, diversity, and power of stakeholders involved. Despite its strong resonance with practice, this framework has not been empirically developed or tested.This paper extends and operationalizes the Sambamurthy–Zmud model by defining measurable constructs for project deliverable specification clarity and stakeholder structure complexity and by theorizing their joint effect on IT project risk. Drawing on information processing theory, stakeholder theory, and socio-technical systems perspectives, the paper argues that IT project uncertainty is not merely a descriptive condition, but a primary driver of project risk. A conceptual model and testable hypotheses are proposed to guide future empirical research and managerial practice in digital transformation projects.

Authors

Publication Details

Published
2025-10-14
DOI
https://doi.org/10.31235/osf.io/2hc9w_v1
Primary Topic
Big Data and Business Intelligence
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Revisiting IT Project Uncertainty: Operationalizing the Sambamurthy–Zmud Model for De-Risking Digital Transformation Projects

Irshad Abdulla
Big Data and Business Intelligence
article

Revisiting IT Project Uncertainty: Operationalizing the Sambamurthy–Zmud Model for De-Risking Digital Transformation Projects

Irshad Abdulla
article en

Abstract

Uncertainty in project deliverables remains a pervasive source of IT project failure, yet its structural origins are rarely operationalized. Sambamurthy and Zmud (2017) proposed a conceptual model linking IT project uncertainty to two fundamental dimensions: (1) the clarity or ambiguity of project deliverable specifications and (2) the number, diversity, and power of stakeholders involved. Despite its strong resonance with practice, this framework has not been empirically developed or tested.This paper extends and operationalizes the Sambamurthy–Zmud model by defining measurable constructs for project deliverable specification clarity and stakeholder structure complexity and by theorizing their joint effect on IT project risk. Drawing on information processing theory, stakeholder theory, and socio-technical systems perspectives, the paper argues that IT project uncertainty is not merely a descriptive condition, but a primary driver of project risk. A conceptual model and testable hypotheses are proposed to guide future empirical research and managerial practice in digital transformation projects.

Openalex Percentile: Top 53%
Big Data and Business Intelligence
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Revisiting IT Project Uncertainty: Operationalizing the Sambamurthy–Zmud Model for De-Risking Digital Transformation Projects — Irshad Abdulla · (2025) | TGRS Research Map | TGRS