A mathematical modelling for integrated construction and production supply chain network design

Nowadays, the construction industry has become one of the most important and crucial sectors of an economy. With the introduction of the concept of the supply chain and the successful use of supply chain management in many production-based industries, it has also entered the construction industry in recent years. In a classical production-based supply chain, the flow of materials and outputs at the end of the chain consists of manufactured products. However, in the construction supply chain, the final output is a building or structure. In this paper, we propose integrating the construction supply chain with a production supply chain planning problem. The facility location decisions (opening and launching facilities), which are very traditional decisions in production supply chain problems, require significant construction activities. However, the construction supply chain concept is not considered in literature for such an important part of a production-based supply chain. When designing the topology of a production supply chain (numbers, capacities, geographic positions of plants and warehouses), a series of construction activities and projects begin to create the strategic structure for the supply chain. Subsequently, once operational, the production supply chain can start producing products to sell to customers. In this article, we will formulate such an integrated problem using a comprehensive mixed integer linear programming optimization model. The aim is designing an optimal structure for the supply chain with minimal construction and production costs by determining optimal amounts of building materials, raw materials, workers, equipment and machinery, transportation methods, and designs based on required construction size. A wide range of examples and test problems are presented, discussed, and compared in detail to investigate and illustrate the performance of proposed mathematical model.

Authors

Institutions

Publication Details

Journal
Scientific Reports
Published
2025-10-14
DOI
https://doi.org/10.1038/s41598-025-21137-9
Citations
1
Primary Topic
Quality and Supply Management
Type
article
Field-Weighted Citation Impact
2.28
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A mathematical modelling for integrated construction and production supply chain network design

Hadi Mokhtari, Saeed Dehnavi, Seyyed Saeed Helli
1 citations
Scientific Reports
Quality and Supply Management
2.28
article

A mathematical modelling for integrated construction and production supply chain network design

Hadi Mokhtari, Saeed Dehnavi, Seyyed Saeed Helli
article en
1 citations

Abstract

Nowadays, the construction industry has become one of the most important and crucial sectors of an economy. With the introduction of the concept of the supply chain and the successful use of supply chain management in many production-based industries, it has also entered the construction industry in recent years. In a classical production-based supply chain, the flow of materials and outputs at the end of the chain consists of manufactured products. However, in the construction supply chain, the final output is a building or structure. In this paper, we propose integrating the construction supply chain with a production supply chain planning problem. The facility location decisions (opening and launching facilities), which are very traditional decisions in production supply chain problems, require significant construction activities. However, the construction supply chain concept is not considered in literature for such an important part of a production-based supply chain. When designing the topology of a production supply chain (numbers, capacities, geographic positions of plants and warehouses), a series of construction activities and projects begin to create the strategic structure for the supply chain. Subsequently, once operational, the production supply chain can start producing products to sell to customers. In this article, we will formulate such an integrated problem using a comprehensive mixed integer linear programming optimization model. The aim is designing an optimal structure for the supply chain with minimal construction and production costs by determining optimal amounts of building materials, raw materials, workers, equipment and machinery, transportation methods, and designs based on required construction size. A wide range of examples and test problems are presented, discussed, and compared in detail to investigate and illustrate the performance of proposed mathematical model.

Scientific ReportsVol. 15(1)
University of Kashan (IR)
Openalex Percentile: Top 9%
Quality and Supply Management
2.28
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.