Integrating Process Safety Consideration to Enhance Route Development and Optimization

In the development of a route to an advanced intermediate, methyl 1-amino-7-(benzyloxy)thieno[3,2-f]quinoline-2-carboxylate (1), significant safety hazards were identified in both the tandem cyanation/nitro reduction and tert-butyl nitrite (TBN)-mediated Sandmeyer reactions. The cyanation exhibited substantial thermal accumulation and severe decomposition due to the use of dimethyl sulfoxide (DMSO) as a solvent, resulting in a Criticality 5 risk level according to Stoessel. Similarly, the TBN-mediated Sandmeyer reaction showed strong decomposition, further compounding the safety concerns. In response to these hazards, a new route was developed. Process safety evaluations played a crucial role in guiding the development of this safer route, which was successfully implemented, leading to substantial improvements in safety, yield, and overall efficiency. This success underscores the critical importance of integrating process safety evaluation during the early stages of process and route development.

Authors

Institutions

Publication Details

Journal
Organic Process Research & Development
Published
2025-10-14
DOI
https://doi.org/10.1021/acs.oprd.5c00274
Citations
1
Primary Topic
Risk and Safety Analysis
Type
article
Field-Weighted Citation Impact
1.40
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Integrating Process Safety Consideration to Enhance Route Development and Optimization

T. Langner, Shasha Zhang, Alexander L. Ruchelman, Antonio C. Ferretti et al.
1 citations
Organic Process Research & Development
Risk and Safety Analysis
1.40
article

Integrating Process Safety Consideration to Enhance Route Development and Optimization

T. Langner, Shasha Zhang, Alexander L. Ruchelman, Antonio C. Ferretti, John R. Coombs, Simon Shun Wang Leung
article en
1 citations

Abstract

In the development of a route to an advanced intermediate, methyl 1-amino-7-(benzyloxy)thieno[3,2-f]quinoline-2-carboxylate (1), significant safety hazards were identified in both the tandem cyanation/nitro reduction and tert-butyl nitrite (TBN)-mediated Sandmeyer reactions. The cyanation exhibited substantial thermal accumulation and severe decomposition due to the use of dimethyl sulfoxide (DMSO) as a solvent, resulting in a Criticality 5 risk level according to Stoessel. Similarly, the TBN-mediated Sandmeyer reaction showed strong decomposition, further compounding the safety concerns. In response to these hazards, a new route was developed. Process safety evaluations played a crucial role in guiding the development of this safer route, which was successfully implemented, leading to substantial improvements in safety, yield, and overall efficiency. This success underscores the critical importance of integrating process safety evaluation during the early stages of process and route development.

Organic Process Research & DevelopmentVol. 29(11)
Bristol-Myers Squibb (United States) (US), Université Bourgogne Franche-Comté (FR)
Openalex Percentile: Top 12%
Risk and Safety Analysis
1.40
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.