Parallel power system restoration planning at distribution level considering uncertainty of renewable generation

The growing share of renewable energy sources (RES) in the grid introduces many challenges for the grid restoration process due to its volatile and intermittent nature. Thus, network operators tended to exclude RES from their restoration planning, leading to unutilized generation potential. This work proposes a two-step restoration algorithm with a focus on inclusion of RES to facilitate the restoration process. The first step involves the formation of electrically isolated islands each with at least one black-start (BS) unit to conduct parallel restoration and speed up overall grid recovery. The predefinition of suitable sections allows switching actions to enable the desired sections during the short time after blackout, which the battery capacities in the substations allow. The second step involves parallel restoration of the defined sub-systems based on optimal restoration paths identified using the modified k-shortest path algorithm to ensure redundancy and minimal restoration times. Lastly, the re-synchronization of sub-systems prepares the network for seamless reconnection with the upstream grid. The proposed approach is implemented and tested on IEEE 34-bus distribution system.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-10-14
DOI
https://doi.org/10.1049/icp.2025.2290
Primary Topic
Smart Grid and Power Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Parallel power system restoration planning at distribution level considering uncertainty of renewable generation

Hendrik Vennegeerts, Yasir Shamim
IET conference proceedings.
Smart Grid and Power Systems
article

Parallel power system restoration planning at distribution level considering uncertainty of renewable generation

Hendrik Vennegeerts, Yasir Shamim
article en

Abstract

The growing share of renewable energy sources (RES) in the grid introduces many challenges for the grid restoration process due to its volatile and intermittent nature. Thus, network operators tended to exclude RES from their restoration planning, leading to unutilized generation potential. This work proposes a two-step restoration algorithm with a focus on inclusion of RES to facilitate the restoration process. The first step involves the formation of electrically isolated islands each with at least one black-start (BS) unit to conduct parallel restoration and speed up overall grid recovery. The predefinition of suitable sections allows switching actions to enable the desired sections during the short time after blackout, which the battery capacities in the substations allow. The second step involves parallel restoration of the defined sub-systems based on optimal restoration paths identified using the modified k-shortest path algorithm to ensure redundancy and minimal restoration times. Lastly, the re-synchronization of sub-systems prepares the network for seamless reconnection with the upstream grid. The proposed approach is implemented and tested on IEEE 34-bus distribution system.

IET conference proceedings.Vol. 2025(14)
University of Duisburg-Essen (DE)
Openalex Percentile: Top 71%
Smart Grid and Power Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Parallel power system restoration planning at distribution level considering uncertainty of renewable generation — Hendrik Vennegeerts, Yasir Shamim · IET conference proceedings. (2025) | TGRS Research Map | TGRS