Distributed Restart - network demonstrations

This paper explores the Network Demonstrations completed as part of the Distributed Restart project which was an innovation completed in partnership between SP Energy Networks (SPEN), NESO and TNEI, designed to provide detailed understanding on how distributed energy resources (DERs) can build, maintain and optimise power islands isolated from the main grid – with a view to driving down the time it would take to restore the network following the extremely unlikely event of total shutdown of Great Britain's electricity grid. The traditional top-down approach would be complimented by the DER enabled bottom-up approach to help ensure the targets detailed in the new Electricity System Restoration Standard (ESRS) be met. Three trials were completed at Redhouse, Chapelcross and Galloway within the SPEN region between 2020-2023 with the anchor generators for the tests being a mix of synchronous and non-synchronous inverter-based assets. Ultimately, these world-first tests set a precedent for the use of DER assets to be used in the UK or worldwide, as viable network restoration service providers. The learnings have been transitioned to BaU with SPEN (and a number of other UK DNOs) now building viable large scale Distributed Restoration Zones (DRZs) to enhance the UKs/ NESO's restoration portfolio.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-10-14
DOI
https://doi.org/10.1049/icp.2025.2178
Primary Topic
Cellular Automata and Applications
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Distributed Restart - network demonstrations

Stephanie L. Hay, Jack Haynes, Eric Leavy, Julie Balch
IET conference proceedings.
Cellular Automata and Applications
article

Distributed Restart - network demonstrations

Stephanie L. Hay, Jack Haynes, Eric Leavy, Julie Balch
article en

Abstract

This paper explores the Network Demonstrations completed as part of the Distributed Restart project which was an innovation completed in partnership between SP Energy Networks (SPEN), NESO and TNEI, designed to provide detailed understanding on how distributed energy resources (DERs) can build, maintain and optimise power islands isolated from the main grid – with a view to driving down the time it would take to restore the network following the extremely unlikely event of total shutdown of Great Britain's electricity grid. The traditional top-down approach would be complimented by the DER enabled bottom-up approach to help ensure the targets detailed in the new Electricity System Restoration Standard (ESRS) be met. Three trials were completed at Redhouse, Chapelcross and Galloway within the SPEN region between 2020-2023 with the anchor generators for the tests being a mix of synchronous and non-synchronous inverter-based assets. Ultimately, these world-first tests set a precedent for the use of DER assets to be used in the UK or worldwide, as viable network restoration service providers. The learnings have been transitioned to BaU with SPEN (and a number of other UK DNOs) now building viable large scale Distributed Restoration Zones (DRZs) to enhance the UKs/ NESO's restoration portfolio.

IET conference proceedings.Vol. 2025(14)
UK Power Networks (GB), Glasgow Life (GB)
Openalex Percentile: Top 70%
Cellular Automata and Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.