Possibilities and requirements on operation of future MVDC networks

After high voltage direct current (HVDC) has gained momentum, the same challenges, as the shift to distributed architecture with high renewables integration, are now causing medium voltage direct current (MVDC) to arise for distribution system. Several pilot projects are emerging worldwide to shed to light the advantages of MVDC technology. These networks are typically deployed on a dedicated area with selected composition of loads and sources under limited power. They have a configuration of a so-called soft link, being connection between two medium voltage alternative current (MVAC) networks and having couple of MVDC nodes with loads and generations. This paper focuses on different MVDC configurations for a representative suburban distribution grid. The goal is to find a technically and economically viable configuration(s) and evaluate the interest of DC technology. A technical economic assessment (TEA) is performed among three networks configurations (full AC, full DC and hybrid MVAC+LVDC) considering qualitative and quantitative key performance indicators (KPI) including converter design, control and protection aspects. The outcome of the study points out the necessity for selection of right use case for MVDC. It also highlights the advantages of a full DC architecture and the challenges for further advancement in maturity of this technology.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-10-14
DOI
https://doi.org/10.1049/icp.2025.2169
Primary Topic
Renewable energy and sustainable power systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Possibilities and requirements on operation of future MVDC networks

Christophe Prévé, Florian Errigo, Daniel Gómez A., P. Novák et al.
IET conference proceedings.
Renewable energy and sustainable power systems
article

Possibilities and requirements on operation of future MVDC networks

Christophe Prévé, Florian Errigo, Daniel Gómez A., P. Novák, P. Alibert, Adriana Campos, Bruno Lefee
article en

Abstract

After high voltage direct current (HVDC) has gained momentum, the same challenges, as the shift to distributed architecture with high renewables integration, are now causing medium voltage direct current (MVDC) to arise for distribution system. Several pilot projects are emerging worldwide to shed to light the advantages of MVDC technology. These networks are typically deployed on a dedicated area with selected composition of loads and sources under limited power. They have a configuration of a so-called soft link, being connection between two medium voltage alternative current (MVAC) networks and having couple of MVDC nodes with loads and generations. This paper focuses on different MVDC configurations for a representative suburban distribution grid. The goal is to find a technically and economically viable configuration(s) and evaluate the interest of DC technology. A technical economic assessment (TEA) is performed among three networks configurations (full AC, full DC and hybrid MVAC+LVDC) considering qualitative and quantitative key performance indicators (KPI) including converter design, control and protection aspects. The outcome of the study points out the necessity for selection of right use case for MVDC. It also highlights the advantages of a full DC architecture and the challenges for further advancement in maturity of this technology.

IET conference proceedings.Vol. 2025(14)
Schneider Electric (France) (FR), Supergrid Institute (FR)
Openalex Percentile: Top 80%
Renewable energy and sustainable power systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Possibilities and requirements on operation of future MVDC networks — Christophe Prévé, Florian Errigo, et al. · IET conference proceedings. (2025) | TGRS Research Map | TGRS