Determining Convergence for Expected Improvement-Based Bayesian Optimization

Bayesian optimization routines may have theoretical convergence results, but determining whether a run has converged in practice can be a subjective task. This paper provides a framework inspired by statistical process control for monitoring an optimization run for convergence. The maximum Expected Improvement (EI) tends to decrease during an optimization run, but decreasing EI is not sufficient for convergence. We consider both a decrease in EI as well as local stability of the variance in order to assess for convergence. The EI process is made more numerically stable through an expected log-normal approximation. An Exponentially Weighted Moving Average control chart is adapted for automated convergence analysis, which allows assessment of stability of both the EI and its variance. The success of the methodology is demonstrated on several examples.

Authors

Institutions

Publication Details

Journal
Mathematics
Published
2025-10-12
DOI
https://doi.org/10.3390/math13203261
Primary Topic
Advanced Statistical Process Monitoring
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Determining Convergence for Expected Improvement-Based Bayesian Optimization

Nicholas R. Grunloh, Herbert K. H. Lee
Mathematics
Advanced Statistical Process Monitoring
article

Determining Convergence for Expected Improvement-Based Bayesian Optimization

Nicholas R. Grunloh, Herbert K. H. Lee
article en

Abstract

Bayesian optimization routines may have theoretical convergence results, but determining whether a run has converged in practice can be a subjective task. This paper provides a framework inspired by statistical process control for monitoring an optimization run for convergence. The maximum Expected Improvement (EI) tends to decrease during an optimization run, but decreasing EI is not sufficient for convergence. We consider both a decrease in EI as well as local stability of the variance in order to assess for convergence. The EI process is made more numerically stable through an expected log-normal approximation. An Exponentially Weighted Moving Average control chart is adapted for automated convergence analysis, which allows assessment of stability of both the EI and its variance. The success of the methodology is demonstrated on several examples.

MathematicsVol. 13(20)
University of California, Santa Cruz (US)
Openalex Percentile: Top 71%
Advanced Statistical Process Monitoring
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Determining Convergence for Expected Improvement-Based Bayesian Optimization — Nicholas R. Grunloh, Herbert K. H. Lee · Mathematics (2025) | TGRS Research Map | TGRS