Optimizing Multilateral Well Operations: Advanced TAML-5 Completion Systems for Enhanced Lateral Access and Operational Efficiency
Abstract When junction issues arise such as gas or water migration that threaten well integrity TAML-5 systems are uniquely positioned to resolve these challenges by providing robust junction isolation. In conventional multilateral wells utilizing standard TAML-5 completions, accessing a lateral typically requires a full rig-based workover, resulting in substantial operational downtime and increased costs. This paper highlights a major operational advancement: the development of specialized TAML-5 completion equipment that not only ensures high well integrity through effective junction isolation, but also allows for independent, through-completion access to both laterals throughout the well's lifespan. This capability eliminates the need to remove the entire completion for interventions like acid stimulation, zonal isolation, or logging, thus enabling rig-less operations and significantly reducing intervention costs. A key operational strategy for isolating problematic formations is the deployment of multilateral technology. The demand for reliable junction isolation has made TAML-5 the preferred solution, especially in scenarios where gas or water breakthrough poses a risk to well integrity. Integrating intelligent completion systems with TAML-5 further enhances reservoir management by enabling selective monitoring and control of each lateral. Maintaining sustained access to both laterals over the well's life is critical for minimizing expensive workovers, prompting a revision and optimization of TAML-5 junction and completion design. While standard TAML-5 completions have proven effective for well integrity, the use of dual-string tubing introduces operational complexity, extended deployment times, and intricate pressure control requirements. To address these challenges, an Advanced Vector Block has been engineered and integrated into the completion design. This innovation supports lateral access and intelligent completion without the need for a dual-string configuration, streamlining deployment and improving operational efficiency. The new system enhances production by incorporating inflow control valves for selective lateral production. It also provides options to isolate either the main bore or the lateral using a pressure isolation sleeve or whipstock, both of which can be deployed via wireline or coiled tubing. This design enables rig-less intervention in any lateral at any point during the well's life, further reducing operational costs and downtime. Field implementation demonstrated that the enhanced TAML-5 system met all design objectives, reducing deployment time by five rig days and streamlining future workover operations. By enabling rig-less access to both laterals and eliminating the need for dual-string completions, the system maintains junction integrity, lowers construction and intervention costs, and extends well life by reducing workover frequency. This operational improvement leads to greater efficiency and asset value, supporting long-term production optimization and cost control.
Authors
- Abdulrakeeb Almasri
- Rami Elsin
- Thomas Fanchin (ORCID: https://orcid.org/0009-0003-9253-1211)
- Abdullah Abdulhalim
- Leonardo Gurlino
- Drew Parks
Institutions
- Halliburton (United Kingdom) (GB)
- Halliburton (United States) (US)
Publication Details
- Journal
- SPE Annual Technical Conference and Exhibition
- Published
- 2025-10-13
- DOI
- https://doi.org/10.2118/228221-ms
- Primary Topic
- Reservoir Engineering and Simulation Methods
- Type
- article
- Field-Weighted Citation Impact
- 0.00