Surge Ahead: Integrated Perforating and Completion Design Maximizes Well Performance

Abstract High fracture-breakdown pressures prevented the initial frac-pack completion of the first controlled dump flood injection well in a highly depleted field offshore deepwater Gulf of Mexico. A fast-track study was sanctioned to better identify the key mechanisms and their cause. Several hypotheses were proposed including wellbore strengthening (stress cage), damage from highly overbalanced drilling and damage during completion operations. Resolving the problem was particularly important to inform the completion design of a subsequent producing well in the same deepwater sand. A comprehensive laboratory program was designed to test some of the hypotheses. The program included large-scale perforation and flow tests to simulate the damage impact of drilling and completion operations at the sand-face and in the near-well region. This paper discusses the lab program, the test results and the frac-pack completion design for the subsequent producing well. The novel and counter-intuitive solution was endorsed by management based on the physics-based, integrated and quantitative approach.

Authors

Institutions

Publication Details

Journal
SPE Annual Technical Conference and Exhibition
Published
2025-10-13
DOI
https://doi.org/10.2118/227880-ms
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Surge Ahead: Integrated Perforating and Completion Design Maximizes Well Performance

Bennie Grové, Kimberly Smith, Chin Moi Chow, J. McGregor
SPE Annual Technical Conference and Exhibition
Drilling and Well Engineering
article

Surge Ahead: Integrated Perforating and Completion Design Maximizes Well Performance

Bennie Grové, Kimberly Smith, Chin Moi Chow, J. McGregor
article en

Abstract

Abstract High fracture-breakdown pressures prevented the initial frac-pack completion of the first controlled dump flood injection well in a highly depleted field offshore deepwater Gulf of Mexico. A fast-track study was sanctioned to better identify the key mechanisms and their cause. Several hypotheses were proposed including wellbore strengthening (stress cage), damage from highly overbalanced drilling and damage during completion operations. Resolving the problem was particularly important to inform the completion design of a subsequent producing well in the same deepwater sand. A comprehensive laboratory program was designed to test some of the hypotheses. The program included large-scale perforation and flow tests to simulate the damage impact of drilling and completion operations at the sand-face and in the near-well region. This paper discusses the lab program, the test results and the frac-pack completion design for the subsequent producing well. The novel and counter-intuitive solution was endorsed by management based on the physics-based, integrated and quantitative approach.

SPE Annual Technical Conference and Exhibition
United States Department of Energy (US), Halliburton (United States) (US), Texas Instruments (United States) (US)
Openalex Percentile: Top 40%
Drilling and Well Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Surge Ahead: Integrated Perforating and Completion Design Maximizes Well Performance — Bennie Grové, Kimberly Smith, et al. · SPE Annual Technical Conference and Exhibition (2025) | TGRS Research Map | TGRS