Step Changed Towards Initial Wellbore Clean Up for New Wells, With Cost Competitiveness

Abstract This paper presents case study of single-step post-drilling wellbore cleanup jobs in presence of sensitive downhole tools Measurement While Drilling (MWD) & Logging While Drilling (LWD). Wellbore cleanup with MWD/LWD presence was not possible earlier when oxidizers/strong acids were used as mud filter-cake cleanup agents. With the development of recombinant enzyme through Site-Directed Mutagenesis, a non-corrosive, highly compatible and polymer-specific cleanup fluid recipe was designed, which met these tools specifications and saved more cost and rig-time in field application. After developing starch-xanthan-biopolymer specific enzymes stable up to 120°C, and testing substrate hydrolysis efficiency, acid concentrations were optimized for different completion plans and formation temperatures. Filter cake removal efficiency was studied in high temperature high pressure (HT-HP) environments, while corrosion levels for each system were measured at temperatures up to 120 °C. Compatibility tests with different elastomers were conducted to evaluate compatibility with MWD/LWD tools. After a full-scale risk analysis and gaining high confidence level, the new cleanup fluid was pumped through Pressure-Balanced Liner (PBL), (circulation by pass sub) around LWD tools, outside bottom hole assembly (BHA), immediately after the completion of drilling without pulling out the drill string. The cleanup fluids were seen to be stable up to 120°C at formation salinity and in the presence of the required acid and buffer dose. Studies on enzymatic kinetics by substrate hydrolysis and reducing sugar estimation show the complete dissolution of the polymers. HT-HP American Petroleum Institute (API) filter showed more than 95% removal of mud cake. Corrosion tests with carbon steel coupons resulted in a corrosion level of 2.6 to 4.3 mil per year (MPY), significantly below the recommended limit of 4.6 MPY. When evaluated on elastomers, namely Nitrile Butadiene Rubber (NBR), Hydrogenated Nitrile Butadiene Rubber (H-NBR), Silicone & Ethylene Propylene Diene Monomer Rubber (EPDM), the cleanup fluid system caused no significant changes in the size (2%), weight and microstructure of the elastomers. After a thorough risk and Quality Assurance& Quality Control (QA/QC) analysis exercise, the system was trialed in one well through one-step treatment, replacing the traditional two-step treatment, while the BHA was in place. The pumping was done through PBL-sub, placed ahead of the MWD-LWD tools. This initiative saved rig time by eliminating a dedicated trip for clean out. Encouraged by this result, more than 50 well-cleanup jobs have been conducted successfully. Additionally, 15-20% production enhancement is achieved in all these wells with no failure reported. This project provides a fully compatible cleanup system with single-step treatment design even in presence of required downhole tools. It replaced the traditional process with a step change through proper assessment and evaluation and resulted in significantly reducing well-completion cost. The post-job QA/QC reports reveal that the system is within acceptance criteria. Disseminating this knowledge may be helpful to reduce cost and save rig time by replicating it in larger petroleum community.

Authors

Institutions

Publication Details

Published
2025-10-13
DOI
https://doi.org/10.2118/226540-ms
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Step Changed Towards Initial Wellbore Clean Up for New Wells, With Cost Competitiveness

Debayan Ghosh, Bisweswar Ghosh, Anwar Al Salti, Khaleel Al Riyami et al.
Drilling and Well Engineering
article

Step Changed Towards Initial Wellbore Clean Up for New Wells, With Cost Competitiveness

Debayan Ghosh, Bisweswar Ghosh, Anwar Al Salti, Khaleel Al Riyami, Qasim Al Rawahi, Saleh Al Saqri, Ali Al Rahbi, Hafidh Al Noamani, Najim Al Kitani
article en

Abstract

Abstract This paper presents case study of single-step post-drilling wellbore cleanup jobs in presence of sensitive downhole tools Measurement While Drilling (MWD) & Logging While Drilling (LWD). Wellbore cleanup with MWD/LWD presence was not possible earlier when oxidizers/strong acids were used as mud filter-cake cleanup agents. With the development of recombinant enzyme through Site-Directed Mutagenesis, a non-corrosive, highly compatible and polymer-specific cleanup fluid recipe was designed, which met these tools specifications and saved more cost and rig-time in field application. After developing starch-xanthan-biopolymer specific enzymes stable up to 120°C, and testing substrate hydrolysis efficiency, acid concentrations were optimized for different completion plans and formation temperatures. Filter cake removal efficiency was studied in high temperature high pressure (HT-HP) environments, while corrosion levels for each system were measured at temperatures up to 120 °C. Compatibility tests with different elastomers were conducted to evaluate compatibility with MWD/LWD tools. After a full-scale risk analysis and gaining high confidence level, the new cleanup fluid was pumped through Pressure-Balanced Liner (PBL), (circulation by pass sub) around LWD tools, outside bottom hole assembly (BHA), immediately after the completion of drilling without pulling out the drill string. The cleanup fluids were seen to be stable up to 120°C at formation salinity and in the presence of the required acid and buffer dose. Studies on enzymatic kinetics by substrate hydrolysis and reducing sugar estimation show the complete dissolution of the polymers. HT-HP American Petroleum Institute (API) filter showed more than 95% removal of mud cake. Corrosion tests with carbon steel coupons resulted in a corrosion level of 2.6 to 4.3 mil per year (MPY), significantly below the recommended limit of 4.6 MPY. When evaluated on elastomers, namely Nitrile Butadiene Rubber (NBR), Hydrogenated Nitrile Butadiene Rubber (H-NBR), Silicone & Ethylene Propylene Diene Monomer Rubber (EPDM), the cleanup fluid system caused no significant changes in the size (2%), weight and microstructure of the elastomers. After a thorough risk and Quality Assurance& Quality Control (QA/QC) analysis exercise, the system was trialed in one well through one-step treatment, replacing the traditional two-step treatment, while the BHA was in place. The pumping was done through PBL-sub, placed ahead of the MWD-LWD tools. This initiative saved rig time by eliminating a dedicated trip for clean out. Encouraged by this result, more than 50 well-cleanup jobs have been conducted successfully. Additionally, 15-20% production enhancement is achieved in all these wells with no failure reported. This project provides a fully compatible cleanup system with single-step treatment design even in presence of required downhole tools. It replaced the traditional process with a step change through proper assessment and evaluation and resulted in significantly reducing well-completion cost. The post-job QA/QC reports reveal that the system is within acceptance criteria. Disseminating this knowledge may be helpful to reduce cost and save rig time by replicating it in larger petroleum community.

Khalifa University of Science and Technology (AE), Muscat College (OM), SciGenom Labs (India) (IN)
Openalex Percentile: Top 64%
Drilling and Well Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.