Construction and Practice of Digital Twin Operation and Maintenance Platform for Water Supply and Drainage Systems in New Energy Power Stations

To address the critical challenges of low operational reliability, high energy consumption, and inefficient fault response in water supply and drainage (WSD) systems of new energy power stations (NEPS), this study proposes a digital twin (DT)-enabled operation and maintenance (O&M) platform with multi-dimensional monitoring, cross-protocol adaptation, and intelligent decision-making capabilities. First, a real-time monitoring model integrating pipeline flow, water quality, and equipment status was constructed, leveraging high-precision sensing networks and machine learning algorithms—specifically, a Support Vector Machine (SVM)-based water quality prediction model (mean absolute error, MAE = 0.03 pH units; root mean square error, RMSE = 0.05 NTU for turbidity) and a Convolutional Neural Network (CNN)-driven equipment fault diagnosis model (accuracy = 98.2%, F1-score = 0.978 for pump bearing faults). Second, a cross-protocol data adaptation framework was designed to achieve seamless integration with Vestas wind turbine equipment, supporting Modbus, IEC 61850, and ThingWorx protocols, with data transmission latency reduced to 87 ± 5 ms and packet loss rate < 0.1%. Finally, the platform was validated in the Inner Mongolia 6000 MW Wind Power Demonstration Station, a world-class onshore wind project. Field test results showed that the platform shortened fault response time from 4.0 ± 0.5 hours to 28 ± 3 minutes (a 91.7% reduction), reduced O&M costs by 32.4% (from (12.6 million/year to )8.5 million/year), and improved annual power generation by 41.2% (from 12.7 GWh to 18.0 GWh) by optimizing anti-freezing energy consumption and reducing equipment downtime. This study provides a scalable technical paradigm for intelligent O&M of NEPS WSD systems, with significant implications for advancing the decarbonization and digitalization of the global energy sector.

Authors

Institutions

Publication Details

Journal
Innovation in Science and Technology
Published
2025-10-13
DOI
https://doi.org/10.63593/ist.2788-7030.2025.09.006
Primary Topic
Technology Assessment and Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Construction and Practice of Digital Twin Operation and Maintenance Platform for Water Supply and Drainage Systems in New Energy Power Stations

Liqin Liu
Innovation in Science and Technology
Technology Assessment and Management
article

Construction and Practice of Digital Twin Operation and Maintenance Platform for Water Supply and Drainage Systems in New Energy Power Stations

Liqin Liu
article en

Abstract

To address the critical challenges of low operational reliability, high energy consumption, and inefficient fault response in water supply and drainage (WSD) systems of new energy power stations (NEPS), this study proposes a digital twin (DT)-enabled operation and maintenance (O&M) platform with multi-dimensional monitoring, cross-protocol adaptation, and intelligent decision-making capabilities. First, a real-time monitoring model integrating pipeline flow, water quality, and equipment status was constructed, leveraging high-precision sensing networks and machine learning algorithms—specifically, a Support Vector Machine (SVM)-based water quality prediction model (mean absolute error, MAE = 0.03 pH units; root mean square error, RMSE = 0.05 NTU for turbidity) and a Convolutional Neural Network (CNN)-driven equipment fault diagnosis model (accuracy = 98.2%, F1-score = 0.978 for pump bearing faults). Second, a cross-protocol data adaptation framework was designed to achieve seamless integration with Vestas wind turbine equipment, supporting Modbus, IEC 61850, and ThingWorx protocols, with data transmission latency reduced to 87 ± 5 ms and packet loss rate < 0.1%. Finally, the platform was validated in the Inner Mongolia 6000 MW Wind Power Demonstration Station, a world-class onshore wind project. Field test results showed that the platform shortened fault response time from 4.0 ± 0.5 hours to 28 ± 3 minutes (a 91.7% reduction), reduced O&M costs by 32.4% (from (12.6 million/year to )8.5 million/year), and improved annual power generation by 41.2% (from 12.7 GWh to 18.0 GWh) by optimizing anti-freezing energy consumption and reducing equipment downtime. This study provides a scalable technical paradigm for intelligent O&M of NEPS WSD systems, with significant implications for advancing the decarbonization and digitalization of the global energy sector.

Innovation in Science and TechnologyVol. 4(8)
China Power Engineering Consulting Group (China) (CN)
Openalex Percentile: Top 65%
Technology Assessment and Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Construction and Practice of Digital Twin Operation and Maintenance Platform for Water Supply and Drainage Systems in New Energy Power Stations — Liqin Liu · Innovation in Science and Technology (2025) | TGRS Research Map | TGRS