Research on the Dynamic Control Path of Procurement Costs Driven by Information Technology Tools: A Case Study of the QG Project

This paper takes the QG project as a case study to explore the application paths of information technology (IT) tools in the dynamic control of procurement costs. By analyzing the current status of procurement cost control in the project, it was found that traditional methods suffer from high budget deviation rates and cost overruns. To address these issues, a dynamic cost control path driven by IT tools was designed and implemented, which includes the selection and integration of tools, the construction of a dynamic cost monitoring system, and the optimization of cost control strategies. After implementation, the project’s budget deviation rate decreased from 6.25% to 2.5%, and cost savings of 30 million yuan were achieved. The study demonstrates that IT tools can effectively enhance the precision and dynamism of procurement cost control, providing practical experience and theoretical support for the standardization of information-based procurement systems in small and medium-sized technology enterprises.

Authors

Institutions

Publication Details

Journal
Innovation in Science and Technology
Published
2025-10-09
DOI
https://doi.org/10.63593/ist.2788-7030.2025.09.002
Primary Topic
ERP Systems Implementation and Impact
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on the Dynamic Control Path of Procurement Costs Driven by Information Technology Tools: A Case Study of the QG Project

Kai Zhang
Innovation in Science and Technology
ERP Systems Implementation and Impact
article

Research on the Dynamic Control Path of Procurement Costs Driven by Information Technology Tools: A Case Study of the QG Project

Kai Zhang
article en

Abstract

This paper takes the QG project as a case study to explore the application paths of information technology (IT) tools in the dynamic control of procurement costs. By analyzing the current status of procurement cost control in the project, it was found that traditional methods suffer from high budget deviation rates and cost overruns. To address these issues, a dynamic cost control path driven by IT tools was designed and implemented, which includes the selection and integration of tools, the construction of a dynamic cost monitoring system, and the optimization of cost control strategies. After implementation, the project’s budget deviation rate decreased from 6.25% to 2.5%, and cost savings of 30 million yuan were achieved. The study demonstrates that IT tools can effectively enhance the precision and dynamism of procurement cost control, providing practical experience and theoretical support for the standardization of information-based procurement systems in small and medium-sized technology enterprises.

Innovation in Science and TechnologyVol. 4(8)
Qihoo 360 (China) (CN)
Openalex Percentile: Top 53%
ERP Systems Implementation and Impact
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Research on the Dynamic Control Path of Procurement Costs Driven by Information Technology Tools: A Case Study of the QG Project — Kai Zhang · Innovation in Science and Technology (2025) | TGRS Research Map | TGRS