Analisis Kelayakan Pemasangan Load Break Switch Motorized Pada Penyulang Anoa Di PT. PLN (Persero) ULP Rumbai

Disturbances in the distribution system cause energy losses and reduce the quality of electricity services. This study aims to analyze the feasibility of installing a Motorized Load Break Switch (LBS) to improve the reliability of the distribution system on the Anoa Feeder at PT PLN (Persero) ULP Rumbai. The method used in this study is simulation using ETAP software to compare the reliability indices of SAIDI, SAIFI, and ENS before and after the installation of the Motorized LBS. The results show that after the installation of the LBS, there was a decrease in SAIDI by 73%, SAIFI by 89%, and ENS by 70%, resulting in a reduction of financial losses from IDR 88,438,619 to IDR 25,920,330 per year. In conclusion, the installation of the Motorized LBS is feasible to implement to improve the reliability of the distribution system and reduce losses due to power outages.

Authors

Institutions

Publication Details

Journal
SainETIn
Published
2025-06-30
DOI
https://doi.org/10.31849/qg8bck08
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Kelayakan Pemasangan Load Break Switch Motorized Pada Penyulang Anoa Di PT. PLN (Persero) ULP Rumbai

Monice, Ganda Prawira, Usaha Situmeang
SainETIn
Management and Optimization Techniques
article

Analisis Kelayakan Pemasangan Load Break Switch Motorized Pada Penyulang Anoa Di PT. PLN (Persero) ULP Rumbai

Monice, Ganda Prawira, Usaha Situmeang
article en

Abstract

Disturbances in the distribution system cause energy losses and reduce the quality of electricity services. This study aims to analyze the feasibility of installing a Motorized Load Break Switch (LBS) to improve the reliability of the distribution system on the Anoa Feeder at PT PLN (Persero) ULP Rumbai. The method used in this study is simulation using ETAP software to compare the reliability indices of SAIDI, SAIFI, and ENS before and after the installation of the Motorized LBS. The results show that after the installation of the LBS, there was a decrease in SAIDI by 73%, SAIFI by 89%, and ENS by 70%, resulting in a reduction of financial losses from IDR 88,438,619 to IDR 25,920,330 per year. In conclusion, the installation of the Motorized LBS is feasible to implement to improve the reliability of the distribution system and reduce losses due to power outages.

SainETInVol. 9(2)
Universitas Lancang Kuning (ID)
Openalex Percentile: Top 58%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.