Agile Project Planning Methodology and Performance of Turnkey Electrical Projects in Kenya

The objective of the study is to establish the influence agile planning approach on the performance of turnkey electrical projects in Kenya. The hypothesis of the study was that there is no significant relationship between agile project planning approach and the performance of turnkey electrical projects. The study utilised correlational design to establish the relationship between the planning approach and project performance indicators without manipulating variables. The unit of analysis is the 15 major turnkey projects executed in the electric transmission and distribution power network in Kenya in the last 18 years. The unit of observation being the 55 project management team members that include project managers, project engineers, project management and finance specialists drawn from the turnkey projects making 55 respondents. The study utilised the census method by targeting the identified respondents and collecting data using a structured questionnaire and conducting key informant interviews for quantitative and qualitative data collection respectively. The study examined the correlation between agile project planning approach and performance of turnkey electrical projects in Kenya. The outcomes showed that the Agile way of project planning had a strong association with project performance, with a correlation coefficient of 0.728 (p < 0.01). Its flexible and iterative nature were popular, with real-time change feedback and client feedback loops both rating a mean of 4.64 (Standard Deviation (SD) = 0.712). The regression model showed that Agile explained 53.0% of the variation in performance (R<sup>2</sup> = 0.530, Adjusted R<sup>2</sup> = 0.519) with an unstandardized coefficient of 0.820 (p < 0.001), showing that a one-unit increase in Agile adoption enhanced performance by 0.820 units. The Analysis of Variance (ANOVA) results supported the significance of the model (F = 48.531, p = 0.000). This aligns with project management literature suggesting the use of Agile in projects requiring flexibility and stakeholder engagement, particularly in infrastructure projects with evolving specifications. The study’s findings and recommendations for policy, practice and future research are provided.

Authors

Institutions

Publication Details

Journal
American Journal of Management Science and Engineering
Published
2025-10-09
DOI
https://doi.org/10.11648/j.ajmse.20251004.12
Primary Topic
Quality and Supply Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Agile Project Planning Methodology and Performance of Turnkey Electrical Projects in Kenya

Isaac Abuya, David Ngua Syengo
American Journal of Management Science and Engineering
Quality and Supply Management
article

Agile Project Planning Methodology and Performance of Turnkey Electrical Projects in Kenya

Isaac Abuya, David Ngua Syengo
article en

Abstract

The objective of the study is to establish the influence agile planning approach on the performance of turnkey electrical projects in Kenya. The hypothesis of the study was that there is no significant relationship between agile project planning approach and the performance of turnkey electrical projects. The study utilised correlational design to establish the relationship between the planning approach and project performance indicators without manipulating variables. The unit of analysis is the 15 major turnkey projects executed in the electric transmission and distribution power network in Kenya in the last 18 years. The unit of observation being the 55 project management team members that include project managers, project engineers, project management and finance specialists drawn from the turnkey projects making 55 respondents. The study utilised the census method by targeting the identified respondents and collecting data using a structured questionnaire and conducting key informant interviews for quantitative and qualitative data collection respectively. The study examined the correlation between agile project planning approach and performance of turnkey electrical projects in Kenya. The outcomes showed that the Agile way of project planning had a strong association with project performance, with a correlation coefficient of 0.728 (p < 0.01). Its flexible and iterative nature were popular, with real-time change feedback and client feedback loops both rating a mean of 4.64 (Standard Deviation (SD) = 0.712). The regression model showed that Agile explained 53.0% of the variation in performance (R<sup>2</sup> = 0.530, Adjusted R<sup>2</sup> = 0.519) with an unstandardized coefficient of 0.820 (p < 0.001), showing that a one-unit increase in Agile adoption enhanced performance by 0.820 units. The Analysis of Variance (ANOVA) results supported the significance of the model (F = 48.531, p = 0.000). This aligns with project management literature suggesting the use of Agile in projects requiring flexibility and stakeholder engagement, particularly in infrastructure projects with evolving specifications. The study’s findings and recommendations for policy, practice and future research are provided.

American Journal of Management Science and EngineeringVol. 10(4)
University of Nairobi (KE)
Openalex Percentile: Top 53%
Quality and Supply Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.