Use Case Point Activity-Based Costing and Adjusted Function Point for Software Cost Estimation
Effective software development planning is vital across various industries, and inadequate planning can lead to project failures. A key part of this planning is accurately estimating effort and costs, which is crucial for staying within budget and meeting deadlines. This research compares two methods – Use Case Point Activity Based Costing (with 21 complexity factors) and Adjusted Function Point (with 16 complexity factors) – for estimating costs versus actual values. The analysis reveals that the Use Case Point method had a 23.52% deviation from actual costs, while the Adjusted Function Point method had a 33.35% deviation. These findings provide essential reference points during software project planning, ensuring estimates closely align with actual values based on project-specific attributes. This deviation underscores the importance of precision and selecting appropriate methodologies tailored to each project’s unique characteristics. Ultimately, this research equips businesses and project managers with a robust financial prudence framework and enhances the likelihood of project success.
Authors
- Dewi Khairani (ORCID: https://orcid.org/0000-0002-2363-9056)
- Suraya Abdul-Razak (ORCID: https://orcid.org/0000-0001-5376-2509)
- Fitri Mintarsih (ORCID: https://orcid.org/0000-0002-4996-3751)
- Andria Farhan
- Ahmad Fauzan Haryono
Institutions
- Syarif Hidayatullah State Islamic University Jakarta (ID)
Publication Details
- Journal
- JURNAL TEKNIK INFORMATIKA
- Published
- 2025-10-13
- DOI
- https://doi.org/10.15408/jti.v18i2.46669
- Primary Topic
- Software Engineering Research
- Type
- article
- Field-Weighted Citation Impact
- 0.00