Understanding Success Factors in Fast-Tracked Oil and Gas Developments

Abstract Globally, oil and gas discoveries are reaching first production faster than ever before driven by operational efficiencies and a willingness to challenge conventional approaches. Yet in Southeast Asia, gas developments still average 13 years from discovery to production, lagging behind the global trend. With declining output and rising energy demand, the region cannot afford delays. Southeast Asia holds an estimated 27 billion barrels of oil equivalent (BBOE) in discovered but undeveloped gas resources highlighting both the challenge and opportunity ahead. Accelerating project timelines is crucial to meet the region's future energy needs. Our analysis identifies 12 critical enablers for accelerating project delivery: (1) commercial volumes; (2) access to market; (3) ease of access to capital; (4) approach to risk; (5) strategic relationships; (6) government/regulator support; (7) one team integrated model; (8) maintain control; (9) parallel workflows; (10) phase approach; (11) standardisation; (12) leverage technology. Through selected case studies, this paper illustrates how these factors have enabled faster timelines and how similar strategies could be applied in Southeast Asia. By adopting these insights, we hope that operators and governments in the region can reduce development lead times, unlock dormant resources, and better secure Southeast Asia's energy future.

Authors

Publication Details

Published
2025-10-13
DOI
https://doi.org/10.2118/226569-ms
Primary Topic
Reservoir Engineering and Simulation Methods
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Understanding Success Factors in Fast-Tracked Oil and Gas Developments

Dylan Mair, Munish Kumar, Aruna Mannie, Arnaud Rostagno et al.
Reservoir Engineering and Simulation Methods
article

Understanding Success Factors in Fast-Tracked Oil and Gas Developments

Dylan Mair, Munish Kumar, Aruna Mannie, Arnaud Rostagno, Andrew Thorburn
article en

Abstract

Abstract Globally, oil and gas discoveries are reaching first production faster than ever before driven by operational efficiencies and a willingness to challenge conventional approaches. Yet in Southeast Asia, gas developments still average 13 years from discovery to production, lagging behind the global trend. With declining output and rising energy demand, the region cannot afford delays. Southeast Asia holds an estimated 27 billion barrels of oil equivalent (BBOE) in discovered but undeveloped gas resources highlighting both the challenge and opportunity ahead. Accelerating project timelines is crucial to meet the region's future energy needs. Our analysis identifies 12 critical enablers for accelerating project delivery: (1) commercial volumes; (2) access to market; (3) ease of access to capital; (4) approach to risk; (5) strategic relationships; (6) government/regulator support; (7) one team integrated model; (8) maintain control; (9) parallel workflows; (10) phase approach; (11) standardisation; (12) leverage technology. Through selected case studies, this paper illustrates how these factors have enabled faster timelines and how similar strategies could be applied in Southeast Asia. By adopting these insights, we hope that operators and governments in the region can reduce development lead times, unlock dormant resources, and better secure Southeast Asia's energy future.

Openalex Percentile: Top 64%
Reservoir Engineering and Simulation Methods
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Understanding Success Factors in Fast-Tracked Oil and Gas Developments — Dylan Mair, Munish Kumar, et al. · (2025) | TGRS Research Map | TGRS