Exertion of 4 Key Elements in Horizontal Drilling, Fostering Cycle Time and Cost Efficiency of Horizontal Well in P-Field, Rokan Area, Sumatera

Abstract Cost efficiency becomes the most prominent aspect in horizontal well to ensure the project remains economically viable, whereas ameliorating cycle time during drilling operation is the simplest way to seize it. The specter of surface and subsurface issue during drilling horizontal well have often been a main cause of either "Diminished Capacity" or "Non-Productive Time". Hence, an appropriate plan in design and execution phase must be done. Four key elements that must be addressed in horizontal well in an attempt to improve cycle time which incurring underrun in cost allocation were examined and emphasized in this paper, it encompasses a robust game plan in hole cleaning, proper bit design for stability and steerability, vigorous BHA design to mitigate hang up issue, and reliable Rig equipment to alleviate possible vital surface equipment failure. A case study in P-field, Rokan Area with 3D horizontal well (turning in high inclination) and historical problems which mostly associated with potential drilling hazards and other related operational condition that must be taken into account such as potential surface leakage, wellbore stability issue, potential kick with formation gas, loss circulation, high torque and drag that lead to potential occurrence of differential sticking and mechanical stuck, as well as limited drilling efficiency. By putting center of attention in those 4 key elements in horizontal drilling in design and execution phase, the well in this study fruitfully represents successful drilling as the fastest horizontal well in the Field Horizontal Well Campaign with improvement in cycle time and cost efficiency. A notable result from the combination of engineering design and process of resolving the potential operational issue in this study can be emulated in horizontal drilling campaigns elsewhere around the world.

Authors

Institutions

Publication Details

Published
2025-10-13
DOI
https://doi.org/10.2118/226480-ms
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Exertion of 4 Key Elements in Horizontal Drilling, Fostering Cycle Time and Cost Efficiency of Horizontal Well in P-Field, Rokan Area, Sumatera

M Taufiqurrahman, Boris Styward, Reinhard Aberson Panjaitan, A. Amri et al.
Drilling and Well Engineering
article

Exertion of 4 Key Elements in Horizontal Drilling, Fostering Cycle Time and Cost Efficiency of Horizontal Well in P-Field, Rokan Area, Sumatera

M Taufiqurrahman, Boris Styward, Reinhard Aberson Panjaitan, A. Amri, Hery Setyawan, A. Pratama, Bintang Fajar Satria, Nugroho Budi Antono, Septino Krishardojono, Deni Mulya
article en

Abstract

Abstract Cost efficiency becomes the most prominent aspect in horizontal well to ensure the project remains economically viable, whereas ameliorating cycle time during drilling operation is the simplest way to seize it. The specter of surface and subsurface issue during drilling horizontal well have often been a main cause of either "Diminished Capacity" or "Non-Productive Time". Hence, an appropriate plan in design and execution phase must be done. Four key elements that must be addressed in horizontal well in an attempt to improve cycle time which incurring underrun in cost allocation were examined and emphasized in this paper, it encompasses a robust game plan in hole cleaning, proper bit design for stability and steerability, vigorous BHA design to mitigate hang up issue, and reliable Rig equipment to alleviate possible vital surface equipment failure. A case study in P-field, Rokan Area with 3D horizontal well (turning in high inclination) and historical problems which mostly associated with potential drilling hazards and other related operational condition that must be taken into account such as potential surface leakage, wellbore stability issue, potential kick with formation gas, loss circulation, high torque and drag that lead to potential occurrence of differential sticking and mechanical stuck, as well as limited drilling efficiency. By putting center of attention in those 4 key elements in horizontal drilling in design and execution phase, the well in this study fruitfully represents successful drilling as the fastest horizontal well in the Field Horizontal Well Campaign with improvement in cycle time and cost efficiency. A notable result from the combination of engineering design and process of resolving the potential operational issue in this study can be emulated in horizontal drilling campaigns elsewhere around the world.

Pertamina (Indonesia) (ID)
Openalex Percentile: Top 65%
Drilling and Well Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Exertion of 4 Key Elements in Horizontal Drilling, Fostering Cycle Time and Cost Efficiency of Horizontal Well in P-Field, Rokan Area, Sumatera — M Taufiqurrahman, Boris Styward, et al. · (2025) | TGRS Research Map | TGRS