Successful Application of Integrated Lost Circulation Control Treatments Using an Innovative Fibrous Pill and Advanced Thixotropic Cement Solutions in Well Control Situations While Drilling and Prior to Cementing in Malaysia

Abstract Drilling and cementing operations in Malaysia's oil and gas wells are frequently challenged by severe to total lost circulation due to the fractured and fissured nature of unconsolidated formations. These issues often lead to increased operational costs and compromised well integrity. Lost circulation during cementing is a critical concern, as it directly impacts zonal isolation and can result in various detrimental consequences including reduced process safety, tubing corrosion, sustained casing pressure, formation damage, loss of production rate, and costly remedial operations. Such losses are typically experienced in vugular or cavernous formations and high permeability zones, with the most frequent occurrences in depleted, highly fractured (induced or natural), or loosely consolidated sandstone and claystone, zones which can be breached at relatively low hydrostatic pressures. This paper presents a successful application of an innovative approach to control lost circulation by utilizing a dual deployment of a fiber-based lost circulation pill alongside an engineered thixotropic cement slurry. This novel method of using integrated technologies has demonstrated exceptional effectiveness in mitigating lost circulation in large fractures up to 10-mm width, even in scenarios of severe to total losses. The strategic implementation of this solution has yielded significant reductions in rig time, decreased mud loss during drilling, and enhanced zonal isolation and wellbore integrity during cementing operations. The findings highlight the potential of this approach to optimize drilling and cementing processes, thereby improving operational efficiency and safeguarding well integrity in challenging formations.

Authors

Institutions

Publication Details

Published
2025-10-13
DOI
https://doi.org/10.2118/226461-ms
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Successful Application of Integrated Lost Circulation Control Treatments Using an Innovative Fibrous Pill and Advanced Thixotropic Cement Solutions in Well Control Situations While Drilling and Prior to Cementing in Malaysia

Cinto Azwar, Horace Andrews, V. Thanasarnpisut, Lau Chee Hen et al.
Drilling and Well Engineering
article

Successful Application of Integrated Lost Circulation Control Treatments Using an Innovative Fibrous Pill and Advanced Thixotropic Cement Solutions in Well Control Situations While Drilling and Prior to Cementing in Malaysia

Cinto Azwar, Horace Andrews, V. Thanasarnpisut, Lau Chee Hen, A. Bubulka, Anh N. Duong, Nora Azima Noordin, Syafiqah Saidin, Reny Kusumawatie, Ankit Kumar, S. S. Zakaria, B. Jain
article en

Abstract

Abstract Drilling and cementing operations in Malaysia's oil and gas wells are frequently challenged by severe to total lost circulation due to the fractured and fissured nature of unconsolidated formations. These issues often lead to increased operational costs and compromised well integrity. Lost circulation during cementing is a critical concern, as it directly impacts zonal isolation and can result in various detrimental consequences including reduced process safety, tubing corrosion, sustained casing pressure, formation damage, loss of production rate, and costly remedial operations. Such losses are typically experienced in vugular or cavernous formations and high permeability zones, with the most frequent occurrences in depleted, highly fractured (induced or natural), or loosely consolidated sandstone and claystone, zones which can be breached at relatively low hydrostatic pressures. This paper presents a successful application of an innovative approach to control lost circulation by utilizing a dual deployment of a fiber-based lost circulation pill alongside an engineered thixotropic cement slurry. This novel method of using integrated technologies has demonstrated exceptional effectiveness in mitigating lost circulation in large fractures up to 10-mm width, even in scenarios of severe to total losses. The strategic implementation of this solution has yielded significant reductions in rig time, decreased mud loss during drilling, and enhanced zonal isolation and wellbore integrity during cementing operations. The findings highlight the potential of this approach to optimize drilling and cementing processes, thereby improving operational efficiency and safeguarding well integrity in challenging formations.

Petronas (Malaysia) (MY), Houston Methodist Sugar Land Hospital (US)
Openalex Percentile: Top 65%
Drilling and Well Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.