Redisigning the Construction of Graving Dock Gate to Get a More Optimal Design

The graving dock gate is one part of the graving dock construction. the construction of the graving dock gate that is directly facing the sea must be able to withstand the load from the water at all times. by making modifications to the Gate construction, the design results are obtained which are quite optimal in terms of weight strength. the redesign of the graving dock Gate pt.barokah galangan perkasa cannot be separated from a problem where the previous construction design was too heavy and exceeded the required laden. Causing the graving dock gate to not be able to float when the water conditions are low. The main size of the graving dock gate pt.barokah galangan perkasa is 3 meters long, 46 meters wide, 7.32 meters high. the method used in this redesign process is to use the e application of the finite element method ANSYS apdl, while 3d modeling uses SketchUp, and AutoCAD.

Authors

Institutions

Publication Details

Journal
Maritime Park Journal of Maritime Technology and Society
Published
2025-10-12
DOI
https://doi.org/10.62012/mp.vi.46023
Primary Topic
Structural Integrity and Reliability Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Redisigning the Construction of Graving Dock Gate to Get a More Optimal Design

INDAH MELATI SUCI
Maritime Park Journal of Maritime Technology and Society
Structural Integrity and Reliability Analysis
article

Redisigning the Construction of Graving Dock Gate to Get a More Optimal Design

INDAH MELATI SUCI
article en

Abstract

The graving dock gate is one part of the graving dock construction. the construction of the graving dock gate that is directly facing the sea must be able to withstand the load from the water at all times. by making modifications to the Gate construction, the design results are obtained which are quite optimal in terms of weight strength. the redesign of the graving dock Gate pt.barokah galangan perkasa cannot be separated from a problem where the previous construction design was too heavy and exceeded the required laden. Causing the graving dock gate to not be able to float when the water conditions are low. The main size of the graving dock gate pt.barokah galangan perkasa is 3 meters long, 46 meters wide, 7.32 meters high. the method used in this redesign process is to use the e application of the finite element method ANSYS apdl, while 3d modeling uses SketchUp, and AutoCAD.

Maritime Park Journal of Maritime Technology and Society
Institut Teknologi Kalimantan (ID)
Openalex Percentile: Top 70%
Structural Integrity and Reliability Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Redisigning the Construction of Graving Dock Gate to Get a More Optimal Design — INDAH MELATI SUCI · Maritime Park Journal of Maritime Technology and Society (2025) | TGRS Research Map | TGRS