Optimization of Maintenance Planning in Nuclear Power Plant Security Systems Using Cuckoo Optimization Algorithm

Optimizing performance is one of the main goals in science and technology.However, it is a significant challenge, as it is usually constrained by safety requirements and budget limitations.As a result, optimization algorithms utilizing artificial intelligence to enhance the performance of industrial systems have been developed over the last few decades.Due to advances in computing and the proven effectiveness of artificial intelligence methods, there has been a growing application of these methods in the nuclear sector.This has encouraged the publication of studies that cover everything from the design phase to maintenance policies and life extension strategies.A nuclear power plant is typically designed for a 40-year service life, during which the reliability of system components, including main and auxiliary safety systems, is ensured by high safety standards and management policies such as maintenance, inspection, and testing.As the end of this period approaches, plants can choose between decommissioning or extending their service life, often opting for life extension to operate for 40 to 60 years, based on feasibility studies that assess component performance and the need for replacements.Maintenance is crucial but can increase system downtime.Therefore, planning for redundant trains, which allow maintenance while the system continues operating, is fundamental.Backup systems must also maintain high levels of reliability to avoid failures when needed.This work developed an optimization tool using Probabilistic Safety Assessment (PSA) and the Cuckoo Optimization Algorithm (COA).Applied to a simplified model of the High-Pressure Injection System of a Pressurized Water Reactor (PWR), the tool aims to increase component reliability and reduce costs and downtime associated with maintenance.COA was chosen for its optimization efficiency, and the fitness function focused on minimizing unavailability and maintenance costs.The results of this work demonstrate an improvement of up to 60% compared to literature.

Authors

Publication Details

Published
2025-01-01
DOI
https://doi.org/10.3850/978-981-94-3281-3_esrel-sra-e2025-p8405-cd
Primary Topic
Advanced Manufacturing and Logistics Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization of Maintenance Planning in Nuclear Power Plant Security Systems Using Cuckoo Optimization Algorithm

Andressa dos Santos Nicolau, João Victor Alegrio
Advanced Manufacturing and Logistics Optimization
article

Optimization of Maintenance Planning in Nuclear Power Plant Security Systems Using Cuckoo Optimization Algorithm

Andressa dos Santos Nicolau, João Victor Alegrio
article en

Abstract

Optimizing performance is one of the main goals in science and technology.However, it is a significant challenge, as it is usually constrained by safety requirements and budget limitations.As a result, optimization algorithms utilizing artificial intelligence to enhance the performance of industrial systems have been developed over the last few decades.Due to advances in computing and the proven effectiveness of artificial intelligence methods, there has been a growing application of these methods in the nuclear sector.This has encouraged the publication of studies that cover everything from the design phase to maintenance policies and life extension strategies.A nuclear power plant is typically designed for a 40-year service life, during which the reliability of system components, including main and auxiliary safety systems, is ensured by high safety standards and management policies such as maintenance, inspection, and testing.As the end of this period approaches, plants can choose between decommissioning or extending their service life, often opting for life extension to operate for 40 to 60 years, based on feasibility studies that assess component performance and the need for replacements.Maintenance is crucial but can increase system downtime.Therefore, planning for redundant trains, which allow maintenance while the system continues operating, is fundamental.Backup systems must also maintain high levels of reliability to avoid failures when needed.This work developed an optimization tool using Probabilistic Safety Assessment (PSA) and the Cuckoo Optimization Algorithm (COA).Applied to a simplified model of the High-Pressure Injection System of a Pressurized Water Reactor (PWR), the tool aims to increase component reliability and reduce costs and downtime associated with maintenance.COA was chosen for its optimization efficiency, and the fitness function focused on minimizing unavailability and maintenance costs.The results of this work demonstrate an improvement of up to 60% compared to literature.

Openalex Percentile: Top 60%
Advanced Manufacturing and Logistics Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Optimization of Maintenance Planning in Nuclear Power Plant Security Systems Using Cuckoo Optimization Algorithm — Andressa dos Santos Nicolau, João Victor Alegrio · (2025) | TGRS Research Map | TGRS