Applying value stream management to improve production processes in LED manufacturing industry - a case study

The company under study is a company specializing in producing light-emitting diodes (LED). The revenue of the company has declined sharply in recent years. After analyzing, the root causes of the problem are high production lead time (LT) and high cycle time (CT) in the production process. The paper applied value stream management to improve the LED production process of the company. The primary objectives were to reduce the production LT and reduce the production CT to meet the takt time (TT) and therefore improve the revenue of the company. The results had shown that the LT had been reduced by 16.44%, from 235.5 minutes to 197 minutes, and the CT reduced by 36.68%, from 45.8 seconds to 29 seconds, meeting the TT

Authors

Institutions

Publication Details

Journal
BOHR International Journal of Advances in Management Research
Published
2025-01-01
DOI
https://doi.org/10.54646/bijamr.2025.39
Primary Topic
Quality and Supply Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Applying value stream management to improve production processes in LED manufacturing industry - a case study

Phong Nguyen Nhu, T. K. O. Doan, Tu Anh Nguyen Nhu
BOHR International Journal of Advances in Management Research
Quality and Supply Management
article

Applying value stream management to improve production processes in LED manufacturing industry - a case study

Phong Nguyen Nhu, T. K. O. Doan, Tu Anh Nguyen Nhu
article en

Abstract

The company under study is a company specializing in producing light-emitting diodes (LED). The revenue of the company has declined sharply in recent years. After analyzing, the root causes of the problem are high production lead time (LT) and high cycle time (CT) in the production process. The paper applied value stream management to improve the LED production process of the company. The primary objectives were to reduce the production LT and reduce the production CT to meet the takt time (TT) and therefore improve the revenue of the company. The results had shown that the LT had been reduced by 16.44%, from 235.5 minutes to 197 minutes, and the CT reduced by 36.68%, from 45.8 seconds to 29 seconds, meeting the TT

BOHR International Journal of Advances in Management ResearchVol. 4(1)
Ho Chi Minh City University of Technology (VN), Monash University (AU)
Openalex Percentile: Top 54%
Quality and Supply Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.