Thames Tideway Tunnel: Blackfriars Bridge Foreshore: innovative in-river construction

A highly constrained location with multiple physical challenges meant an innovative solution was required for the interception of the Fleet Main combined sewer overflow (CSO) at the Blackfriars Bridge Foreshore site. The old CSO outfall located under a low-headroom arch of Blackfriars Bridge meant a cast-in-situ concrete interception could not be constructed. This paper describes how an innovative alternative was employed, comprising a precast concrete box structure initially cast within a dry dock and then floated into position below the bridge. A physical model was constructed and various scenarios were tested to demonstrate that the theoretical assumptions could be relied upon in the real situation. The physical modelling meant that risks inherent with such an unusual operation were minimised and the float-out operation was planned with full knowledge of how the culvert would behave under varying conditions. The collaboration between the main contractor, permanent and temporary works designers, the project manager and other stakeholders shows that it is possible to overcome seemingly unsurmountable challenges with inventive ideas and good planning and preparation. The successful outcome of the float-out operation and placing of the floated culvert has helped contribute to the exceptional Thames Tideway Tunnel project.

Authors

Institutions

Publication Details

Journal
Proceedings of the Institution of Civil Engineers - Civil Engineering
Published
2025-10-09
DOI
https://doi.org/10.1680/jcien.25.00199
Citations
2
Primary Topic
Geotechnical Engineering and Analysis
Type
article
Field-Weighted Citation Impact
2.61
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Thames Tideway Tunnel: Blackfriars Bridge Foreshore: innovative in-river construction

Francisco Guerra Quesada, Edward H. Power, Matthew Prentice, Simon Chittenden et al.
2 citations
Proceedings of the Institution of Civil Engineers - Civil Engineering
Geotechnical Engineering and Analysis
2.61
article

Thames Tideway Tunnel: Blackfriars Bridge Foreshore: innovative in-river construction

Francisco Guerra Quesada, Edward H. Power, Matthew Prentice, Simon Chittenden, Peter Rouzel
article en
2 citations

Abstract

A highly constrained location with multiple physical challenges meant an innovative solution was required for the interception of the Fleet Main combined sewer overflow (CSO) at the Blackfriars Bridge Foreshore site. The old CSO outfall located under a low-headroom arch of Blackfriars Bridge meant a cast-in-situ concrete interception could not be constructed. This paper describes how an innovative alternative was employed, comprising a precast concrete box structure initially cast within a dry dock and then floated into position below the bridge. A physical model was constructed and various scenarios were tested to demonstrate that the theoretical assumptions could be relied upon in the real situation. The physical modelling meant that risks inherent with such an unusual operation were minimised and the float-out operation was planned with full knowledge of how the culvert would behave under varying conditions. The collaboration between the main contractor, permanent and temporary works designers, the project manager and other stakeholders shows that it is possible to overcome seemingly unsurmountable challenges with inventive ideas and good planning and preparation. The successful outcome of the float-out operation and placing of the floated culvert has helped contribute to the exceptional Thames Tideway Tunnel project.

Proceedings of the Institution of Civil Engineers - Civil EngineeringVol. 178(6)
Laing O'Rourke (United Kingdom) (GB), Ferrovial (United Kingdom) (GB), Jacobs (United Kingdom) (GB)
Openalex Percentile: Top 10%
Geotechnical Engineering and Analysis
2.61
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.