Challenges of LSPB contract strategy in brownfield projects for the oil and gas industry: a case for adaptability in bulk plant developments

This paper explores the limitations of employing Lump Sum Procure and Build (LSPB) contracts in brownfield oil and gas projects, particularly within bulk plant developments. While LSPB contracts offer cost predictability and defined deliverables, their rigid structure often proves unsuitable for the dynamic and complex nature of brownfield environments. Challenges such as scope uncertainty, late vendor input, unforeseen site conditions, and the integration of evolving digital systems frequently lead to delays, cost overruns, and disputes. This paper highlights how the traditional waterfall project execution model, commonly used in LSPB contracts, struggles to accommodate the iterative design and real-time adjustments necessary in operational facilities. To address these shortcomings, the paper proposes several adaptive strategies, including hybrid contract models, early vendor involvement, phased execution, and performance-based contracting. These approaches aim to enhance flexibility, reduce risk, and improve collaboration between stakeholders. By integrating best practices from project management and construction industry research, the paper advocates for a more adaptable and outcome-focused contracting strategy tailored to the unique demands of brownfield developments in the oil and gas sector.

Authors

Publication Details

Journal
Technium Romanian Journal of Applied Sciences and Technology
Published
2025-10-09
DOI
https://doi.org/10.47577/technium.v30i.13223
Primary Topic
Economic, financial, and policy analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Challenges of LSPB contract strategy in brownfield projects for the oil and gas industry: a case for adaptability in bulk plant developments

Abdulatif Alwossabee, Musaab Al-Qahtani
Technium Romanian Journal of Applied Sciences and Technology
Economic, financial, and policy analysis
article

Challenges of LSPB contract strategy in brownfield projects for the oil and gas industry: a case for adaptability in bulk plant developments

Abdulatif Alwossabee, Musaab Al-Qahtani
article en

Abstract

This paper explores the limitations of employing Lump Sum Procure and Build (LSPB) contracts in brownfield oil and gas projects, particularly within bulk plant developments. While LSPB contracts offer cost predictability and defined deliverables, their rigid structure often proves unsuitable for the dynamic and complex nature of brownfield environments. Challenges such as scope uncertainty, late vendor input, unforeseen site conditions, and the integration of evolving digital systems frequently lead to delays, cost overruns, and disputes. This paper highlights how the traditional waterfall project execution model, commonly used in LSPB contracts, struggles to accommodate the iterative design and real-time adjustments necessary in operational facilities. To address these shortcomings, the paper proposes several adaptive strategies, including hybrid contract models, early vendor involvement, phased execution, and performance-based contracting. These approaches aim to enhance flexibility, reduce risk, and improve collaboration between stakeholders. By integrating best practices from project management and construction industry research, the paper advocates for a more adaptable and outcome-focused contracting strategy tailored to the unique demands of brownfield developments in the oil and gas sector.

Technium Romanian Journal of Applied Sciences and TechnologyVol. 30
Openalex Percentile: Top 55%
Economic, financial, and policy analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Challenges of LSPB contract strategy in brownfield projects for the oil and gas industry: a case for adaptability in bulk plant developments — Abdulatif Alwossabee, Musaab Al-Qahtani · Technium Romanian Journal of Applied Sciences and Technology (2025) | TGRS Research Map | TGRS