Analisis Profitabilitas pada Proyek Rehabilitasi Jalan Banjaragung Pulosari Jombang

Profitability analysis is a key factor in evaluating the success of construction projects. This study focuses on the profitability of the Banjaragung - Pulosari road rehabilitation project in Jombang. The rehabilitation project spans 1,566 meters in length and 3 meters in width, with a project value of IDR 1,534,120,251. To determine the profit level, a profitability analysis is required. The main objective of this report is to provide an understanding of profitability analysis in the construction industry, particularly in the Banjaragung - Pulosari road rehabilitation project in Jombang, by presenting the Return on Investment (ROI), Internal Rate of Return (IRR), and Benefit-Cost Ratio (BCR) methods as tools for evaluating profitability. The analysis results show a favorable outcome with an ROI of 29% and an IRR of 10.42% per year, which is higher than the East Java Regional Development Bank’s Prime Lending Rate (SBDK) of 6% per year. A BCR of 1.0669 also indicates that the benefits exceed the costs, signifying that the project has high investment return potential and is viable to undertake.

Authors

Institutions

Publication Details

Journal
Jurnal Sipil Terapan
Published
2024-10-25
DOI
https://doi.org/10.58169/jusit.v2i2.601
Primary Topic
Urban Transport Systems Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Profitabilitas pada Proyek Rehabilitasi Jalan Banjaragung Pulosari Jombang

Totok Yulianto, Titin Sundari, Meriana Wahyu Nugroho, Dita Irtanti Febrianita
Jurnal Sipil Terapan
Urban Transport Systems Analysis
article

Analisis Profitabilitas pada Proyek Rehabilitasi Jalan Banjaragung Pulosari Jombang

Totok Yulianto, Titin Sundari, Meriana Wahyu Nugroho, Dita Irtanti Febrianita
article en

Abstract

Profitability analysis is a key factor in evaluating the success of construction projects. This study focuses on the profitability of the Banjaragung - Pulosari road rehabilitation project in Jombang. The rehabilitation project spans 1,566 meters in length and 3 meters in width, with a project value of IDR 1,534,120,251. To determine the profit level, a profitability analysis is required. The main objective of this report is to provide an understanding of profitability analysis in the construction industry, particularly in the Banjaragung - Pulosari road rehabilitation project in Jombang, by presenting the Return on Investment (ROI), Internal Rate of Return (IRR), and Benefit-Cost Ratio (BCR) methods as tools for evaluating profitability. The analysis results show a favorable outcome with an ROI of 29% and an IRR of 10.42% per year, which is higher than the East Java Regional Development Bank’s Prime Lending Rate (SBDK) of 6% per year. A BCR of 1.0669 also indicates that the benefits exceed the costs, signifying that the project has high investment return potential and is viable to undertake.

Jurnal Sipil TerapanVol. 2(2)
Universitas Hasyim Asy'ari (ID)
Openalex Percentile: Top 66%
Urban Transport Systems Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.