Potential Market for the Simultaneous Provision of Instantaneous and Primary Reserves in Germany

This paper proposes a German market framework for the combined provision of instantaneous reserve (IR) and primary reserve (PR), aligned with German VDE FNN guidelines. The review on the regulation and markets gives an insight on balancing services, presenting a frequency-based control power that is used to stabilize the grid. A simplified model demonstrates the simultaneous supply of IR and PR using grid-forming inverters and a pricing structure for IR is introduced to evaluate the profitability of the inertia provision in this combined market. A case study quantifies additional IR provision and profits from a 50 MW storage system alongside a PR bid, showing the potential for increased market opportunities.

Authors

Institutions

Publication Details

Published
2025-06-29
DOI
https://doi.org/10.1109/powertech59965.2025.11180713
Citations
1
Primary Topic
German Economic Analysis & Policies
Type
article
Field-Weighted Citation Impact
3.13
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Potential Market for the Simultaneous Provision of Instantaneous and Primary Reserves in Germany

Maurício Sperandio, Martin Wolter, Christoph Sauer, João Pedro Scherer Cipriani et al.
1 citations
German Economic Analysis & Policies
3.13
article

Potential Market for the Simultaneous Provision of Instantaneous and Primary Reserves in Germany

Maurício Sperandio, Martin Wolter, Christoph Sauer, João Pedro Scherer Cipriani, Gabriel Cocco, Humberto Pinheiro
article en
1 citations

Abstract

This paper proposes a German market framework for the combined provision of instantaneous reserve (IR) and primary reserve (PR), aligned with German VDE FNN guidelines. The review on the regulation and markets gives an insight on balancing services, presenting a frequency-based control power that is used to stabilize the grid. A simplified model demonstrates the simultaneous supply of IR and PR using grid-forming inverters and a pricing structure for IR is introduced to evaluate the profitability of the inertia provision in this combined market. A case study quantifies additional IR provision and profits from a 50 MW storage system alongside a PR bid, showing the potential for increased market opportunities.

Universidade Federal de Santa Maria (BR), Otto-von-Guericke-Universität Magdeburg (DE)
Openalex Percentile: Top 6%
German Economic Analysis & Policies
3.13
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Potential Market for the Simultaneous Provision of Instantaneous and Primary Reserves in Germany — Maurício Sperandio, Martin Wolter, et al. · (2025) | TGRS Research Map | TGRS