Modelling of Photovoltaic Plants with Communication Delays based on Field Measurements

This paper describes a general methodology for modelling renewable energy plants, in both discrete and continuous time domains, based on field measurements, for control design purposes. The plant model is obtained by applying standard identification techniques to the measured input-output data. It aims to accurately capture the delays and dynamics of the plant in response to sinusoidal power set-points within the frequency range relevant to small-signal electromechanical oscillations (0.1–1.5 Hz). This paper focuses on the communication delays between the central controller and the generation units, as well as the computation time of the devices involved in the centralised plant control. The proposed methodology is applied to an operational medium-scale photovoltaic plant connected to the distribution system of Spain. The identified models are validated against the real system using time-domain simulations and Bode plots, showing an adequate performance in the frequencies of interest.

Authors

Institutions

Publication Details

Published
2025-06-29
DOI
https://doi.org/10.1109/powertech59965.2025.11180733
Primary Topic
solar cell performance optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Modelling of Photovoltaic Plants with Communication Delays based on Field Measurements

Juan Manuel Mauricio, Luna Moreno-Díaz
solar cell performance optimization
article

Modelling of Photovoltaic Plants with Communication Delays based on Field Measurements

Juan Manuel Mauricio, Luna Moreno-Díaz
article en

Abstract

This paper describes a general methodology for modelling renewable energy plants, in both discrete and continuous time domains, based on field measurements, for control design purposes. The plant model is obtained by applying standard identification techniques to the measured input-output data. It aims to accurately capture the delays and dynamics of the plant in response to sinusoidal power set-points within the frequency range relevant to small-signal electromechanical oscillations (0.1–1.5 Hz). This paper focuses on the communication delays between the central controller and the generation units, as well as the computation time of the devices involved in the centralised plant control. The proposed methodology is applied to an operational medium-scale photovoltaic plant connected to the distribution system of Spain. The identified models are validated against the real system using time-domain simulations and Bode plots, showing an adequate performance in the frequencies of interest.

Universidad de Sevilla (ES)
Openalex Percentile: Top 72%
solar cell performance optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.