Contracting Strategies for Electrolyzers to Secure Grid Connection: The Dutch Case
In response to increasing grid congestion in the Netherlands, non-firm connection and transport agreements (CTAs) and capacity restriction contracts (CRCs) have been introduced, allowing consumer curtailment in exchange for grid tariff discounts or per-MW compensations. This study examines the interaction between an electrolyzer project, facing sizing and contracting decisions, and a network operator, responsible for contract activations and determining grid connection capacity, under the new Dutch regulations. The interaction is modeled using two bilevel optimization problems with alternating leader-follower roles. Results highlight a trade-off between CRC income and non-firm CTA tariff discounts, showing that voluntary congestion management by the network operator increases electrolyzer profitability at CRC prices below €10/MW but reduces it at higher prices. Furthermore, the network operator benefits more from reacting to the electrolyzer owner’s CTA decisions than from leading the interaction at CRC prices above €10/MW. Ignoring the other party’s optimization problem overestimates profits for both the network operator and the electrolyzer owner, emphasizing the importance of coordinated decision-making.
Authors
- Thomas Swarts
- Jalal Kazempour (ORCID: https://orcid.org/0000-0002-5050-6611)
- J.G. Slootweg (ORCID: https://orcid.org/0000-0003-1593-1839)
- Wouter Van Den Akker
- Johan Morren
- Arjan van Voorden
Institutions
- Eindhoven University of Technology (NL)
- Technical University of Denmark (DK)
- Delft University of Technology (NL)
Publication Details
- Published
- 2025-06-29
- DOI
- https://doi.org/10.1109/powertech59965.2025.11180471
- Citations
- 1
- Primary Topic
- Global Energy Security and Policy
- Type
- article
- Field-Weighted Citation Impact
- 1.79