Proactive Planning of Low-Voltage Networks for the Energy Transition: Benefits Demonstrated in a Large Real Case Study

The rapid integration of Distributed Energy Resources (DERs) challenges Distribution System Operators (DSOs) in maintaining reliable and efficient power supply in low-voltage (LV) networks. Reactive planning methods, which address issues as they arise, often lead to suboptimal asset utilization, repeated infrastructure upgrades, and hinder the integration of new technologies. Proactive methods in LV networks is still limited due to uncertainties in localized DER adoption and computation complexity.Utilizing a comprehensive proactive framework and a scalable simulation environment, we apply our methodology to all the LV-network data from BKW Energie AG, one of Switzerland’s largest DSOs. Our empirical study demonstrates that proactive network planning significantly reduces total investment costs compared to reactive methods by optimizing resource allocation and minimizing repeated upgrades, even under future uncertainties. In addition, proactive approaches enable the optimal integration of On-Load Tap Changers, which enhance voltage regulation capabilities, accommodating higher levels of DER integration without extensive network reinforcements. These results highlight the potential benefits of adopting proactive planning strategies in LV networks, providing DSOs with actionable insights to improve network reliability, efficiency, and adaptability in an evolving energy landscape.

Authors

Institutions

Publication Details

Published
2025-06-29
DOI
https://doi.org/10.1109/powertech59965.2025.11180254
Primary Topic
Low-power high-performance VLSI design
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Proactive Planning of Low-Voltage Networks for the Energy Transition: Benefits Demonstrated in a Large Real Case Study

Yamshid Farhat, Torsten Braun
Low-power high-performance VLSI design
article

Proactive Planning of Low-Voltage Networks for the Energy Transition: Benefits Demonstrated in a Large Real Case Study

Yamshid Farhat, Torsten Braun
article en

Abstract

The rapid integration of Distributed Energy Resources (DERs) challenges Distribution System Operators (DSOs) in maintaining reliable and efficient power supply in low-voltage (LV) networks. Reactive planning methods, which address issues as they arise, often lead to suboptimal asset utilization, repeated infrastructure upgrades, and hinder the integration of new technologies. Proactive methods in LV networks is still limited due to uncertainties in localized DER adoption and computation complexity.Utilizing a comprehensive proactive framework and a scalable simulation environment, we apply our methodology to all the LV-network data from BKW Energie AG, one of Switzerland’s largest DSOs. Our empirical study demonstrates that proactive network planning significantly reduces total investment costs compared to reactive methods by optimizing resource allocation and minimizing repeated upgrades, even under future uncertainties. In addition, proactive approaches enable the optimal integration of On-Load Tap Changers, which enhance voltage regulation capabilities, accommodating higher levels of DER integration without extensive network reinforcements. These results highlight the potential benefits of adopting proactive planning strategies in LV networks, providing DSOs with actionable insights to improve network reliability, efficiency, and adaptability in an evolving energy landscape.

University of Bern (CH), Bern University of Applied Sciences (CH), Swiss Federal Office of Energy (CH)
Openalex Percentile: Top 72%
Low-power high-performance VLSI design
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.