Wrought Tee Intersections Operating in the Creep Range, Part II: Actions to Procure Serviceable Tees

Abstract Over the last decade hundreds of events in wrought tee intersections designed to ASME B16.9 and stamped as a fitting to A- or SA-234 have been documented by industry. These components are frequently installed in main steam and hot reheat systems, operate in the creep range, are specified to be Grade 22, Grade 91 or Grade 92, and have experienced extensive damage, cracks or leaks in ∼40,000 to 150,000 hours of operation. Part I addressed the damage mechanisms, identified several common vulnerabilities, and called into question the serviceability of these components for long-term operation. Part II explores the mitigation strategies for new plant or replacement tees. Several actions are detailed that must be incorporated into a robust technical purchase specification to address the shortcomings regarding the complex network of codes and standards to which these tees are typically designed and fabricated. The recommendations presented account for the constraints in the supply chain or the present piping configuration, such as for a replacement tee. Lastly, opportunities are identified for refinement and enhancements to the minimum requirements in existing codes and standards that will be essential to achieving acceptable serviceability in the time-dependent range.

Authors

Institutions

Publication Details

Published
2025-07-20
DOI
https://doi.org/10.1115/pvp2025-155829
Primary Topic
Transport and Economic Policies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Wrought Tee Intersections Operating in the Creep Range, Part II: Actions to Procure Serviceable Tees

John Siefert, Ian J. Perrin, Patricia T. Becker, Thomas Sambor
Transport and Economic Policies
article

Wrought Tee Intersections Operating in the Creep Range, Part II: Actions to Procure Serviceable Tees

John Siefert, Ian J. Perrin, Patricia T. Becker, Thomas Sambor
article en

Abstract

Abstract Over the last decade hundreds of events in wrought tee intersections designed to ASME B16.9 and stamped as a fitting to A- or SA-234 have been documented by industry. These components are frequently installed in main steam and hot reheat systems, operate in the creep range, are specified to be Grade 22, Grade 91 or Grade 92, and have experienced extensive damage, cracks or leaks in ∼40,000 to 150,000 hours of operation. Part I addressed the damage mechanisms, identified several common vulnerabilities, and called into question the serviceability of these components for long-term operation. Part II explores the mitigation strategies for new plant or replacement tees. Several actions are detailed that must be incorporated into a robust technical purchase specification to address the shortcomings regarding the complex network of codes and standards to which these tees are typically designed and fabricated. The recommendations presented account for the constraints in the supply chain or the present piping configuration, such as for a replacement tee. Lastly, opportunities are identified for refinement and enhancements to the minimum requirements in existing codes and standards that will be essential to achieving acceptable serviceability in the time-dependent range.

Environmental Protection Agency (DK), China Power Engineering Consulting Group (China) (CN)
Openalex Percentile: Top 59%
Transport and Economic Policies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.