A Review of the Use of Load Indicating Studs During Assembly and Optimization of a Coke Drum BUD Joint

Abstract Bottom Un-heading Devices (BUD’s) are often installed on coke drums to facilitate remote opening and closing of the bottom of the drum pair during petroleum coke production. The BUD removes the need for personnel to manually open the drum, which is a high-risk activity and has led to many process safety incidents across the refining industry, and in some cases may offer shortened time to close the drum, resulting in increased production time. These valves are bolted to the bottom head flange and typically only removed during scheduled maintenance intervals, often exceeding five years. During service, the bolted joint must maintain integrity while being subjected to repeated thermal transients during the drum cycle. Correct design and assembly of these critical joints is essential to avoid safety risks and expensive downtime resulting from operational leaks. This paper will show how the use of load indicating studs can achieve reliable assembly, optimize scheduled re-tightening activities and provide effective ongoing joint management. Three case studies will be presented detailing how to correctly assemble and manage a typical BUD joint throughout its life cycle involving the use of load indicating studs. In each case, the joints have maintained integrity during service and allowed the plant engineers to gather reliable data to ensure effective future joint management. Load indicating studs alone cannot guarantee leak free operation and should be used in conjunction with a properly designed joint. BUD anatomy will be explored with insights into the fundamentals of reliable joint from flange geometry, gasket behavior and a review of common assembly techniques.

Authors

Institutions

Publication Details

Published
2025-07-20
DOI
https://doi.org/10.1115/pvp2025-154389
Primary Topic
Innovations in Concrete and Construction Materials
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Review of the Use of Load Indicating Studs During Assembly and Optimization of a Coke Drum BUD Joint

Warren Brown, Stefan G. Llewellyn Smith, Antonio Seijas, Jfe Steel et al.
Innovations in Concrete and Construction Materials
article

A Review of the Use of Load Indicating Studs During Assembly and Optimization of a Coke Drum BUD Joint

Warren Brown, Stefan G. Llewellyn Smith, Antonio Seijas, Jfe Steel, Alex Berry, Kevin Roethemeyer, Rob Cowlam
article en

Abstract

Abstract Bottom Un-heading Devices (BUD’s) are often installed on coke drums to facilitate remote opening and closing of the bottom of the drum pair during petroleum coke production. The BUD removes the need for personnel to manually open the drum, which is a high-risk activity and has led to many process safety incidents across the refining industry, and in some cases may offer shortened time to close the drum, resulting in increased production time. These valves are bolted to the bottom head flange and typically only removed during scheduled maintenance intervals, often exceeding five years. During service, the bolted joint must maintain integrity while being subjected to repeated thermal transients during the drum cycle. Correct design and assembly of these critical joints is essential to avoid safety risks and expensive downtime resulting from operational leaks. This paper will show how the use of load indicating studs can achieve reliable assembly, optimize scheduled re-tightening activities and provide effective ongoing joint management. Three case studies will be presented detailing how to correctly assemble and manage a typical BUD joint throughout its life cycle involving the use of load indicating studs. In each case, the joints have maintained integrity during service and allowed the plant engineers to gather reliable data to ensure effective future joint management. Load indicating studs alone cannot guarantee leak free operation and should be used in conjunction with a properly designed joint. BUD anatomy will be explored with insights into the fundamentals of reliable joint from flange geometry, gasket behavior and a review of common assembly techniques.

Phillips 66 (United States) (US), Integrity Systems (United States) (US), Petroleum Technology Company (Norway) (NO), Phillips University (US)
Openalex Percentile: Top 70%
Innovations in Concrete and Construction Materials
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.