Inspection and Analysis of Pressure Vessel With Combined CUI and Wet H2S Damage

Abstract A debutanizer tower in a Coker gas plant was inspected for Corrosion Under Insulation (CUI) as a part of a Risk Based Inspection program. External corrosion found in the upper section of the tower was further inspected for remaining wall thickness where internal wet H2S damage was found (from the outside). Overlaid inspection results identified areas where external corrosion and internal wet H2S damage were overlapping and a Level 3 Fitness for Service analysis was started. Detailed inspection scanning aided in separating the damaged area into multiple zones, although blister proximity required larger fields to be grouped together. Due to the size of blister fields, non-Post Weld Heat Treated construction, structural discontinuities, and external corrosion, the Fitness for Service analysis results were unfavorable and the equipment was taken out of service for repair. The original tower section was removed and replaced with upgrades in a short duration outage. The original tower section was cleaned and internally inspected with Wet Fluorescent Magnetic Particle Testing to validate Phased Array Ultrasonic Testing data. After completion of the internal inspection, the tower section was hydrostatically tested to original conditions to evaluate Fitness for Service modeling assumptions provided by Phased Array Ultrasonic Testing.

Authors

Institutions

Publication Details

Published
2025-07-20
DOI
https://doi.org/10.1115/pvp2025-155552
Primary Topic
Mechanical Failure Analysis and Simulation
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Inspection and Analysis of Pressure Vessel With Combined CUI and Wet H2S Damage

Jason Morris, Joseph Pennell, Kevin M. Haley
Mechanical Failure Analysis and Simulation
article

Inspection and Analysis of Pressure Vessel With Combined CUI and Wet H2S Damage

Jason Morris, Joseph Pennell, Kevin M. Haley
article en

Abstract

Abstract A debutanizer tower in a Coker gas plant was inspected for Corrosion Under Insulation (CUI) as a part of a Risk Based Inspection program. External corrosion found in the upper section of the tower was further inspected for remaining wall thickness where internal wet H2S damage was found (from the outside). Overlaid inspection results identified areas where external corrosion and internal wet H2S damage were overlapping and a Level 3 Fitness for Service analysis was started. Detailed inspection scanning aided in separating the damaged area into multiple zones, although blister proximity required larger fields to be grouped together. Due to the size of blister fields, non-Post Weld Heat Treated construction, structural discontinuities, and external corrosion, the Fitness for Service analysis results were unfavorable and the equipment was taken out of service for repair. The original tower section was removed and replaced with upgrades in a short duration outage. The original tower section was cleaned and internally inspected with Wet Fluorescent Magnetic Particle Testing to validate Phased Array Ultrasonic Testing data. After completion of the internal inspection, the tower section was hydrostatically tested to original conditions to evaluate Fitness for Service modeling assumptions provided by Phased Array Ultrasonic Testing.

BP (United Kingdom) (GB), Center for Health and Gender Equity (US), BP (United States) (US)
Openalex Percentile: Top 71%
Mechanical Failure Analysis and Simulation
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.