Hybrid estimation of distribution and tabu search algorithm for flexible job shop scheduling problem with multi-resource constraints

As the competition becomes more and more fierce, manufacturing enterprises, in addition to improving production efficiency as much as possible, reducing resource consumption, and improving profitability, also provide customers with personalized, customized products to meet the endless needs of customers to attract customers and compete for more markets. In the actual production process, the time spent in the processing is very little, most of which is consumed in resource allocation and production scheduling, so the development of a good resource management and production scheduling plan is crucial to improve the production efficiency of enterprises and reduce energy consumption costs. This paper proposes a hybrid distribution estimation algorithm and Tabu search (HEDA-TS) algorithm framework to solve the multi-resource constraints flexible job shop scheduling problem with limited auxiliary module replacement times (MRCFJSP-AR). Through the comparison of 15 examples, the superior performance of the HEDA-TS algorithm in solving MRCFJSP-AR with limited module replacement times is verified, and the effectiveness of the multi-population strategy and non-dominated solution memory mechanism is highlighted.

Authors

Institutions

Publication Details

Published
2025-05-16
DOI
https://doi.org/10.1145/3757110.3757118
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Hybrid estimation of distribution and tabu search algorithm for flexible job shop scheduling problem with multi-resource constraints

Yibing Li, Wencheng Wu
Scheduling and Optimization Algorithms
article

Hybrid estimation of distribution and tabu search algorithm for flexible job shop scheduling problem with multi-resource constraints

Yibing Li, Wencheng Wu
article en

Abstract

As the competition becomes more and more fierce, manufacturing enterprises, in addition to improving production efficiency as much as possible, reducing resource consumption, and improving profitability, also provide customers with personalized, customized products to meet the endless needs of customers to attract customers and compete for more markets. In the actual production process, the time spent in the processing is very little, most of which is consumed in resource allocation and production scheduling, so the development of a good resource management and production scheduling plan is crucial to improve the production efficiency of enterprises and reduce energy consumption costs. This paper proposes a hybrid distribution estimation algorithm and Tabu search (HEDA-TS) algorithm framework to solve the multi-resource constraints flexible job shop scheduling problem with limited auxiliary module replacement times (MRCFJSP-AR). Through the comparison of 15 examples, the superior performance of the HEDA-TS algorithm in solving MRCFJSP-AR with limited module replacement times is verified, and the effectiveness of the multi-population strategy and non-dominated solution memory mechanism is highlighted.

Wuhan University of Technology (CN)
Openalex Percentile: Top 60%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Hybrid estimation of distribution and tabu search algorithm for flexible job shop scheduling problem with multi-resource constraints — Yibing Li, Wencheng Wu · (2025) | TGRS Research Map | TGRS