A Proposal for Integrating IPbus ALFRED into the ALICE- FIT setup

The official data collection for the Run 3 of the Large Hadron Collider (LHC) at CERN in Geneva commenced on July 5, 2022, following approximately three and a half years of maintenance, upgrades, and commissioning. Among the many upgrades to ALICE (A Large Ion Collider Experiment) is the new Fast Interaction Trigger (FIT) detector. Constant improvements to FIT’s hardware, firmware, and software will enable progressively better performance. Between November 2024 and March 2025, during the year-end technical stop, an update to the communication path between the Front-End Electronics (FEE) and the Detector Control System (DCS) is planned. This update will introduce a new approach based on the ALFRED (ALICE Low-Level Front-End Device) software, supported by the central DCS ALICE system. To address the challenge of integrating custom electronics with distributed control systems, this paper describes a novel extension of the Front-End Device (FRED) framework, which can interface bespoke electronics with standard SCADA (Supervisory Control and Data Acquisition) systems using IPbus. This framework can be applied to all detectors utilizing IPbus communication.

Authors

Institutions

Publication Details

Journal
EPJ Web of Conferences
Published
2025-01-01
DOI
https://doi.org/10.1051/epjconf/202533701328
Primary Topic
Particle Detector Development and Performance
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Proposal for Integrating IPbus ALFRED into the ALICE- FIT setup

K. Rosłon
EPJ Web of Conferences
Particle Detector Development and Performance
article

A Proposal for Integrating IPbus ALFRED into the ALICE- FIT setup

K. Rosłon
article en

Abstract

The official data collection for the Run 3 of the Large Hadron Collider (LHC) at CERN in Geneva commenced on July 5, 2022, following approximately three and a half years of maintenance, upgrades, and commissioning. Among the many upgrades to ALICE (A Large Ion Collider Experiment) is the new Fast Interaction Trigger (FIT) detector. Constant improvements to FIT’s hardware, firmware, and software will enable progressively better performance. Between November 2024 and March 2025, during the year-end technical stop, an update to the communication path between the Front-End Electronics (FEE) and the Detector Control System (DCS) is planned. This update will introduce a new approach based on the ALFRED (ALICE Low-Level Front-End Device) software, supported by the central DCS ALICE system. To address the challenge of integrating custom electronics with distributed control systems, this paper describes a novel extension of the Front-End Device (FRED) framework, which can interface bespoke electronics with standard SCADA (Supervisory Control and Data Acquisition) systems using IPbus. This framework can be applied to all detectors utilizing IPbus communication.

EPJ Web of ConferencesVol. 337
Warsaw University of Technology (PL)
CERN
Openalex Percentile: Top 87%
Particle Detector Development and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.